Permit Details

Permit Search

Permit

New Residential Construction

266 SW CHALLENGER LN
LAKE CITY, FL 32025

Permit #
000054697
Application #
74121
Status Completed
  1. Submitted Nov 13, 2025
  2. Issued Dec 17, 2025
  3. Expires Nov 15, 2026
  4. Completed Jun 1, 2026

Property

Parcel #
08106-113
Owner
Bixler Timothy Albert, Bixler Lisa Ellen
Acres
0.49
Subdivision
Country Landings
Zoning
RSF-2
Flood zone
AE
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Special Flood Hazard Area
Finished floor requirement
FFE = 111'+ One foot above FEMA Map Elevation
Requirement needed
By Final Inspection
Document needed is
Elevation Certificate
Document receieved
Yes
Fema map number
12023C0293D
In floodway
N
This is the construction of a
Accessory Dwelling
Setbacks Front
25'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
15'
Stories
2
Heated Area (Sqft)
786
Total Area (Sqft)
3366
Building Height
24
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Storage
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
25-0770
If Other, explain the use of the structure.
airport hangar to be constructed concurrently with residence
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Point Review - Processing
  3. Point Review - Pre-submittal Review Notes
  4. Point Review - Processing
  5. Zoning Review - Sent for Zoning Review
  6. Application Status Update Notification
  7. Submitted by building department on applicant's behalf
  8. Application Status Update Notification
  9. Application Status Update Notification
  10. Application Status Update Notification
  11. Application Status Update Notification
  12. Application Status Update Notification
  13. Application Status Update Notification
  14. Application Status Update Notification
  15. Application Status Update Notification
  16. Application Status Update Notification
  17. Application Status Update Notification
  18. Application Status Update Notification
  19. Application Status Update Notification
  20. Application Status Update Notification
  21. Permit Issued

Contractors

  • Tabitha M Sibel

    Rjh Construction

    License
    CGC1515388
    Title
    General Contractor
    Role
    Contractor

    County License & State License Expired.

  • Robert Lynch

    Third Day Electric Llc

    License
    EC13001947
    Title
    Cert. Electrical
    Role
    Subcontractor

    County License & State License Expired.

  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Tabitha M Sibel

    Rjh Construction

    License
    CCC1331967
    Title
    Cert. Roofing
    Role
    Subcontractor

    County License & State License Expired.

  • Timothy D Shatto

    Shatto Heating & Air, Inc.

    License
    CAC057875
    Title
    A/c Class B
    Role
    Subcontractor

Inspections

  1. Dec 22, 2025

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Matt Forsyth

  2. Dec 29, 2025

    Passed: Building - Footer

    Inspected by Matt Forsyth

  3. Dec 29, 2025

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  4. Jan 26, 2026

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  5. Jan 26, 2026

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Matt Forsyth

  6. Feb 16, 2026

    Passed: Electrical - 1st Underground Rough–In

    Second Rough

    Inspected by Matt Forsyth

  7. Feb 16, 2026

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Inspected by Matt Forsyth

  8. Feb 17, 2026

    Failed: Building - Framing

    Portal Garage Hold Down Missing

    Inspected by Matt Forsyth

  9. Feb 27, 2026

    Passed: Building - Insulation

    Inspected by Matt Forsyth

  10. Apr 1, 2026

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  11. Apr 21, 2026

    Septic Release Inspection

    Inspected by Health Dept

  12. Apr 30, 2026

    Passed: Electrical - Permanent Power

    Inspected by Matt Forsyth

  13. Apr 30, 2026

    Release to power company

    Inspected by Matt Forsyth

  14. May 19, 2026

    Passed: Building - Final

    *blower Door & Final Termite Required Prior To Co-- 5.26.26 Mg

    Inspected by Matt Forsyth

Documents