Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 266 SW CHALLENGER LN
LAKE CITY, FL 32025
Parcel #: 08106-113
Acres: 0.49
Owner: Bixler Timothy Albert, Bixler Lisa Ellen
Subdivision: Country Landings
Zoning: RSF-2
Flood Zone: AE
District: 5
Application #: 74121
Permit #: 000054697
Related Permit:
Submitted: Thursday, November 13, 2025
Issued: Wednesday, December 17, 2025
Expires: Wednesday, August 26, 2026
Completed:
Status: Permit Issued
Septic Release? No
Notes:
*FINAL SEPTIC REQUIRED PRIOR TO RELEASE OF POWER *BLOWER DOOR AND FINAL TERMITE REQUIRED PRIOR TO CO FINAL ELEVATION CERTIFICATE IS REQUIRED PRIOR TO RELEASE OF POWER. BFE PLUS 1 FT
Job Details
Finished floor requirement
Fema map number 12023C0291D
Type Roofing Job Replacement - Tear off Existing and Replace
Further Job Details (Explain if decking is being replaced and or Repairs are being done.) Remove existing roof and replace with 50 mil PVC Duro-Last
Type of structure Commercial Building
Commercial or Residential Commercial
Roof Area (for this job) Sq Ft 36.00
No. of Stories 1
Roof Pitch Less than 2:12
Is the existing roof being removed? Yes
Type of New Roofing Product Other
Florida Product Approval Number FL-16039
Product Manufacturer Duro-Last
Product Description 50 mil PVC Duro-Last
Building Code Edition 2020 Florida Building Code 7th Edition and Florida Statute 553.844
Sealed roof decking options: (Must select an option.) Other (explain)
Sealed roof decking explanation for other option. 50 mill PVC Duro-Last roof system
Ventilation: Off-ridge Vent
Flashing: Replace All
Drip Edge: Use Existing
Valley Treatment: Use Existing
Any cable and/or race-way wiring located on or within the roof assembly? No
Review Notes
11/3/2025 Application pending.
11/3/2025 Point Review - Processing
11/4/2025 Point Review - Pre-submittal Review Notes
11/4/2025 Point Review - Processing
11/7/2025 Zoning Review - Sent for Zoning Review
11/13/2025 Application Status Update Notification
11/13/2025 Submitted by building department on applicant's behalf
11/16/2025 Application Status Update Notification
11/20/2025 Application Status Update Notification
11/24/2025 Application Status Update Notification
11/26/2025 Application Status Update Notification
11/26/2025 Application Status Update Notification
12/2/2025 Application Status Update Notification
12/3/2025 Application Status Update Notification
12/8/2025 Application Status Update Notification
12/9/2025 Application Status Update Notification
12/10/2025 Application Status Update Notification
12/12/2025 Application Status Update Notification
12/16/2025 Application Status Update Notification
12/16/2025 Application Status Update Notification
12/17/2025 Permit Issued
Contractors
Name/ Business License Title Role
Tabitha M Sibel
Rjh Construction
CGC1515388 General Contractor Contractor
Robert Lynch
Third Day Electric Llc
Liability Insurance & Workers Comp Expired.
EC13001947 Cert. Electrical Subcontractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Tabitha M Sibel
Rjh Construction
CCC1331967 Cert. Roofing Subcontractor
Timothy D Shatto
Shatto Heating & Air, Inc.
CAC057875 A/c Class B Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Plumbing/Gas - 1st Underground Rough–In Matt Forsyth 12/22/2025
Passed: Building - Footer Matt Forsyth 12/29/2025
Passed: Engineering - Setbacks Matt Forsyth 12/29/2025
Passed: Building - Roof Decking Matt Forsyth 1/26/2026
Passed: Building - Ext Strapping/Wall Sheathing Matt Forsyth 1/26/2026
Passed: Electrical - 1st Underground Rough–In Second Rough Matt Forsyth 2/16/2026
Passed: Plumbing/Gas - Tub Set/Shower Pan Matt Forsyth 2/16/2026
Failed: Building - Framing Portal Garage Hold Down Missing Matt Forsyth 2/17/2026
Passed: Building - Insulation Matt Forsyth 2/27/2026