Permit
135 NW WINDING PLLAKE CITY, FL 32055
This is an owner-builder project.
Donald Davis
High Springs Electric Inc
Donald R Davis
Brent Mccall
Suwannee Valley Plumbing Llc
Septic Release Inspection
Inspected by Health Dept
Cancelled: Building - Monolithic Slab
Inspected by Mgarber
Cancelled: Engineering - Setbacks
Passed: Building - Footer
Inspected by Matt Forsyth
Passed: Engineering - Setbacks
Passed: Plumbing/Gas - 1st Underground Rough–In
Passed: Electrical - 1st Underground Rough–In
Passed: Building - Monolithic Slab
Hook Bar Complete
Passed: Building - Wall Sheathing
Passed: Building - Roof Decking
Passed: Building - Ext Strapping/Wall Sheathing
Passed: Building - Framing
Passed: Electrical - 2nd Rough-In
Passed: Plumbing/Gas - 2nd Rough-In
Passed: Mechanical - Rough In
Passed: Building - Insulation
Batt Insulation.
Passed: Plumbing/Gas - Tub Set/Shower Pan
Passed: Electrical - Permanent Power
Power Coming From Main House
Release to power company
Submitted Power Release through FPL Portal
Inspected by Ward, Emaleigh C.
Passed: Building - Final
*all Requirements Met To Release Co-- 6.2.26 Mg