Failed: Electrical - Reconnect Service Final
1. No Bonding Screw In Main Panel, 2. Service Conductors Cannot Be Reduced By Cutting Of Part Of The Wiring, They Must Be Full Size, 3. Remove The Green Wire Between Meter And Neutral Bar In Main Disconnect (not Needed), 4. Cannot Use Aluminum Wire To And Grounding Electrode, 5. Need Anti-oxidant Compound On All Aluminum Wires
Inspected by Gary Pitzer