Permit Details

Permit Search

Permit

New Residential Construction

266 SW CHALLENGER LN
LAKE CITY, FL 32025

Permit #
000054642
Application #
74111
Status Completed
  1. Submitted Dec 9, 2025
  2. Issued Dec 9, 2025
  3. Expires Nov 14, 2026
  4. Completed May 26, 2026

Property

Parcel #
08106-113
Owner
Bixler Timothy Albert, Bixler Lisa Ellen
Acres
0.49
Subdivision
Country Landings
Zoning
RSF-2
Flood zone
0.2 PCT ANNUAL CHANCE FLOOD HAZARD
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Special Flood Hazard Area
Finished floor requirement
111' or higher Top of the finished floor One foot above FEMA Map Elevation
Requirement needed
By Permanent Power
Document needed is
Elevation Certificate
Document receieved
Yes
Fema map number
12023C0293D
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
25'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
15'
Stories
1
Heated Area (Sqft)
1215
Total Area (Sqft)
1505
Building Height
18
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
25-0770
If Other, explain the use of the structure.
house
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Point Review - Pre-submittal Review Notes
  3. Point Review - Processing
  4. Zoning Review - Sent for Zoning Review
  5. Application Status Update Notification
  6. Application Status Update Notification
  7. Application Status Update Notification
  8. Point Review-Corrections Needed
  9. Application Status Update Notification
  10. Point Review-Corrections Needed
  11. Application Status Update Notification
  12. Application Status Update Notification
  13. Application Status Update Notification
  14. Application Status Update Notification
  15. Submitted by building department on applicant's behalf
  16. Application Status Update Notification
  17. Permit Issued
  18. Permit Status Update Notification

Contractors

  • Tabitha M Sibel

    Rjh Construction

    License
    CGC1515388
    Title
    General Contractor
    Role
    Contractor

    County License & State License Expired.

  • Robert Lynch

    Third Day Electric Llc

    License
    EC13001947
    Title
    Cert. Electrical
    Role
    Subcontractor

    County License & State License Expired.

  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Tabitha M Sibel

    Rjh Construction

    License
    CCC1331967
    Title
    Cert. Roofing
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Dec 22, 2025

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Matt Forsyth

  2. Dec 29, 2025

    Passed: Building - Footer

    Inspected by Matt Forsyth

  3. Jan 16, 2026

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  4. Jan 20, 2026

    Cancelled: Building - Roof Decking

    Inspected by Mgarber

  5. Jan 20, 2026

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Matt Forsyth

  6. Jan 30, 2026

    Passed: Electrical - 1st Underground Rough–In

    Inspected by Matt Forsyth

  7. Jan 30, 2026

    Passed: Building - Framing

    Inspected by Matt Forsyth

  8. Jan 30, 2026

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  9. Jan 30, 2026

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  10. Feb 9, 2026

    Passed: Building - Insulation

    Inspected by Matt Forsyth

  11. Mar 12, 2026

    Passed: Electrical - Permanent Power

    Septic Release Needed Along With Ele Certificate

    Inspected by Matt Forsyth

  12. Apr 8, 2026

    Passed: Electrical - 2nd Rough-In

    Need Elevation Certificate And Septic

    Inspected by Matt Forsyth

  13. Apr 21, 2026

    Septic Release Inspection

    Inspected by Health Dept

  14. Apr 30, 2026

    Release to power company

    Inspected by Mforsyth

  15. May 18, 2026

    Passed: Building - Final

    *all Requirements Met To Release Co-- 5.26.26

    Inspected by Matt Forsyth

Documents