Permit Details

Permit Search

Permit

New Residential Construction

130 SW HUNTER LEIGH PL
LAKE CITY, FL 32024

Permit #
000054639
Application #
72842
Status Completed
  1. Submitted Aug 22, 2025
  2. Issued Dec 8, 2025
  3. Expires Jan 25, 2027
  4. Completed Aug 5, 2026

Property

Parcel #
09607-103
Owner
Murchison Julia B,
Acres
5.01
Subdivision
Melissa's Secret Garden
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0395C
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
960
Total Area (Sqft)
1600
Building Height
13
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
24-0643
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Point Review - Pre-submittal Review Notes
  3. Point Review - Pre-submittal Review Notes
  4. Point Review - Pre-submittal Review Notes
  5. Point Review - Pre-submittal Review Notes
  6. Point Review - Pre-submittal Review Notes
  7. Point Review - Pre-submittal Review Notes
  8. Point Review - Pre-submittal Review Notes
  9. Point Review - Pre-submittal Review Notes
  10. Point Review - Pre-submittal Review Notes
  11. Point Review - Pre-submittal Review Notes
  12. Point Review - Pre-submittal Review Notes
  13. Plan Review - Documents Required
  14. Point Review - Pre-submittal Review Notes
  15. Application Status Update Notification
  16. Application Status Update Notification
  17. Application Status Update Notification
  18. Application Status Update Notification
  19. Application Status Update Notification
  20. Submitted by building department on applicant's behalf
  21. Application Status Update Notification
  22. Application Status Update Notification
  23. Permit Issued

Contractors

  • Matthew A Erkinger,sr.

    Erkinger Construction Group

    License
    CRC1330825
    Title
    Residential Contractor
    Role
    Contractor

    County License & State License & Liability Insurance Expired.

Inspections

  1. Dec 30, 2025

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Gary Pitzer

  2. Jan 2, 2026

    Passed: Engineering - Setbacks

    Inspected by Gary Pitzer

  3. Jan 2, 2026

    Passed: Electrical - Footer Steel & Grounding

    Inspected by Gary Pitzer

  4. Jan 2, 2026

    Cancelled: Building - Monolithic Slab

    Inspected by Gpitzer

  5. Jan 2, 2026

    Cancelled: Electrical - Footer Steel & Grounding

    Inspected by Gpitzer

  6. Jan 2, 2026

    Cancelled: Engineering - Setbacks

    Inspected by Gpitzer

  7. Apr 10, 2026

    Passed: Building - Framing

    Inspected by Gary Pitzer

  8. Apr 10, 2026

    Passed: Plumbing/Gas - 2nd Rough-In

    Water Preasurized

    Inspected by Gary Pitzer

  9. Apr 10, 2026

    Passed: Electrical - 2nd Rough-In

    Inspected by Gary Pitzer

  10. Apr 21, 2026

    Passed: Building - Insulation

    Foam,, Walls And Ceiling

    Inspected by Gary Pitzer

  11. Jul 28, 2026

    Passed: Electrical - Permanent Power

    Ready For Building Final

    Inspected by Troy Crews

  12. Jul 28, 2026

    Release to power company

    Inspected by Troy Crews

  13. Jul 29, 2026

    Passed: Building - Final

    Inspected by Troy Crews

  14. Aug 5, 2026

    Septic Release Inspection

    Inspected by Health Dept

Documents