| Cancelled: Building - Monolithic Slab |
|
Tcrews |
12/10/2025 |
| Passed: Building - Footer |
|
Troy Crews |
12/11/2025 |
| Passed: Engineering - Setbacks |
|
Troy Crews |
12/11/2025 |
| Passed: Electrical - Footer Steel & Grounding |
|
Troy Crews |
12/11/2025 |
| Passed: Electrical - Temporary Power Service |
|
Troy Crews |
12/11/2025 |
| Release to power company |
Re-sending |
Nanderson |
12/17/2025 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
Dwv And Water That Was Pressured For Under Slab Work |
Gary Pitzer |
12/23/2025 |
| Cancelled: Electrical - 1st Underground Rough–In |
|
Gpitzer |
12/30/2025 |
| Cancelled: Building - Slab |
|
Gpitzer |
12/30/2025 |
| Passed: Electrical - 1st Underground Rough–In |
|
Gary Pitzer |
12/31/2025 |
| Passed: Building - Slab |
Rebar And Wire,plastic Taped, Pleas Forward Termite Info For Slab To Our Office, Nothing Located In Box At Site. Thank You |
Gary Pitzer |
12/31/2025 |
| Passed: Building - Roof Decking |
|
Troy Crews |
1/29/2026 |
| Passed: Building - Wall Sheathing |
|
Troy Crews |
1/29/2026 |
| Passed: Plumbing/Gas - Tub Set/Shower Pan |
|
Gary Pitzer |
2/20/2026 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Gary Pitzer |
2/20/2026 |
| Passed: Electrical - 2nd Rough-In |
|
Gary Pitzer |
2/20/2026 |
| Passed: Mechanical - Rough In |
No Equipment Set |
Gary Pitzer |
2/20/2026 |
| Passed: Building - Framing |
|
Gary Pitzer |
2/20/2026 |
| Passed: Building - Ext Strapping/Wall Sheathing |
|
Gary Pitzer |
2/20/2026 |
| Passed: Building - Insulation |
Walls Blowen In, Knee Walls In Attic Batts, Attic Will Be Blow In Later Date |
Gary Pitzer |
2/26/2026 |
| Passed: Electrical - Permanent Power |
Power Equipment Ok, Need Septic Approved |
Gary Pitzer |
4/17/2026 |
| Septic Release Inspection |
|
Health Dept |
4/24/2026 |
| Release to power company |
Per Blake, Drive Final Required Prior To Release Of Co-- 4.27.26 Mg |
Mgarber |
4/27/2026 |