Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Mobile Home Permit

Address 163 SW RIDDLE LN
LAKE CITY, FL 32024
Parcel #: 02772-053
Acres: 0.94
Owner: Cruz Raphael,
Subdivision:
Zoning: RR
Flood Zone: X
District: 3
Application #: 73538
Permit #: 000054501
Related Permit:
Submitted: Tuesday, September 30, 2025
Issued: Monday, November 17, 2025
Expires: Sunday, July 5, 2026
Completed:
Status: Permit Issued
Septic Release? Yes
Notes:
*LOT OF RECORD BY WAY OF 1987 RECORDED DEED *MFE = 12" ABOVE THE ADJAVENT GROUND FOR THE ENTIRE PERIMETER OF THE FOUNDATION *FINAL SEPTIC REQUIRED PRIOR TO RELEASE OF POWER *REPLACING EXISTING MH, OLD MH MUST BE REMOVED PRIOR TO CO
Job Details
Finished floor requirement
Fema map number 12023C0380C
What is the power service for? Existing Site Built Home
Other job details: Existing meter to remain. New 200 amp ATS and 22Kw generator to be installed
Power Company Clay Electric
Septic # (00-0000) or (X00-000) x22
Electrical Code Edition 2017 National Electrical Code
Meter or Account: Meter
Meter or Account #: 154 740 030
Number of requested AMPS for electrical service: 200
Is the power service? Generator Install
Residential or Commercial? Residential
Review Notes
9/30/2025 Application pending.
9/30/2025 Point Review - Processing
10/6/2025 Point Review - Pre-submittal Review Notes
10/20/2025 Point Review - Pre-submittal Review Notes
10/30/2025 Point Review - Pre-submittal Review Notes
10/31/2025 Point Review - Pre-submittal Review Notes
10/31/2025 Point Review - Pre-submittal Review Notes
10/31/2025 Application submitted by applicant.
11/3/2025 Application submitted by applicant.
11/7/2025 Point Review - Pre-submittal Review Notes
11/12/2025 Application submitted by applicant.
11/13/2025 Application Status Update Notification
11/14/2025 Application submitted by applicant.
11/14/2025 Application Status Update Notification
11/17/2025 Permit Issued
Contractors
Name/ Business License Title Role
Jerome Jordan

IH1129310 Mh Installer (ih) Contractor
Inspections
Inspection Notes Performed By Date
Septic Release Inspection Health Dept 10/16/2025
Cancelled: Mobile Home - In County Pre-Mobile Home before set-up Mgarber 10/20/2025
Passed: Mobile Home - In County Pre-Mobile Home before set-up Verified Wind Zone 2. Home Appears To Be In Habitable Condition Christian Allen 10/31/2025
Passed: Mobile Home - Mobile Home Set-Up Final Requirements Met To Release Power, Old Mh Must Be Removed Prior To Co Issuance-- 3.18.26 Mg Matt Forsyth 1/6/2026
Release to power company Ok To Release Power-- 1.6.26 Mg Matt Forsyth 1/6/2026
Passed: Engineering - Setbacks Matt Forsyth 1/6/2026
Submitted Power Release through FPL Portal Garber, Melissa 1/6/2026