Permit Details

Permit Search

Permit

New Residential Construction

2151 SW KOONVILLE AVE
LAKE CITY, FL 32024

Permit #
000054470
Application #
73694
Status Completed
  1. Submitted Oct 9, 2025
  2. Issued Nov 13, 2025
  3. Expires Dec 14, 2026
  4. Completed Jun 25, 2026

Property

Parcel #
00330-000
Owner
Proveaux Stephen Revocable Trust Agreement Executed November 12, 2022
Acres
89.80
Subdivision
—
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
12" above adjacent grade for the entire perimeter of the foundation
Fema map number
12023C0270C
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2024
Total Area (Sqft)
2815
Building Height
18
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
25-0589
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Point Review - Pre-submittal Review Notes
  3. Point Review - Pre-submittal Review Notes
  4. Point Review - Pre-submittal Review Notes
  5. Point Review - Pre-submittal Review Notes
  6. Point Review - Pre-submittal Review Notes
  7. Point Review - Pre-submittal Review Notes
  8. Point Review - Pre-submittal Review Notes
  9. New address issued and ticket completed.
  10. Point Review - Pre-submittal Review Notes
  11. Point Review - Pre-submittal Review Notes
  12. Submitted by building department on applicant's behalf
  13. Point Review - Reviewed
  14. Zoning Review - Reviewed
  15. Plan Review - Reviewed
  16. Final Review - Reviewed
  17. Application submitted by applicant.
  18. Final Review - Payment Needed
  19. Permit Issued

Contractors

  • Bryan Zecher

    Bryan Zecher Homes Inc

    License
    CBC1257343
    Title
    Building Contractor
    Role
    Contractor
  • Bryan Zecher

    Bryan Zecher Homes Inc

    License
    CBC1257343
    Title
    Building Contractor
    Role
    Subcontractor
  • Bryan Zecher

    Bryan Zecher Homes Inc

    License
    CBC1257343
    Title
    Building Contractor
    Role
    Subcontractor
  • Bryan Zecher

    Bryan Zecher Homes Inc

    License
    CBC1257343
    Title
    Building Contractor
    Role
    Subcontractor
  • Bryan Zecher

    Bryan Zecher Homes Inc

    License
    CBC1257343
    Title
    Building Contractor
    Role
    Subcontractor

Inspections

  1. Oct 30, 2025

    Septic Release Inspection

    Inspected by Health Dept

  2. Nov 18, 2025

    Passed: Building - Footer

    Inspected by Matt Forsyth

  3. Nov 18, 2025

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  4. Nov 18, 2025

    Passed: Electrical - Footer Steel & Grounding

    Inspected by Matt Forsyth

  5. Dec 11, 2025

    Passed: Electrical - Temporary Power Service

    Inspected by Matt Forsyth

  6. Dec 12, 2025

    Release to power company

    Ok To Release Temp Power-- 12.12.25 Mg

    Inspected by Mforsyth

  7. Dec 12, 2025

    Submitted Power Release through FPL Portal

    Inspected by Garber, Melissa

  8. Dec 30, 2025

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Matt Forsyth

  9. Jan 27, 2026

    Passed: Building - Slab

    Inspected by Matt Forsyth

  10. Feb 19, 2026

    Passed: Building - Wall Sheathing

    Inspected by Matt Forsyth

  11. Feb 19, 2026

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Matt Forsyth

  12. Feb 19, 2026

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  13. Mar 5, 2026

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  14. Mar 5, 2026

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  15. Mar 5, 2026

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  16. Mar 5, 2026

    Passed: Building - Framing

    Inspected by Matt Forsyth

  17. Mar 12, 2026

    Passed: Building - Insulation

    Inspected by Matt Forsyth

  18. Apr 21, 2026

    Passed: Electrical - Permanent Power

    *all Requirements Met To Release Power-- 4.29.26 Mg

    Inspected by Matt Forsyth

  19. Apr 21, 2026

    Passed: Planning and Zoning Review - Elevation Confirmation

    2 Blocks High 16"

    Inspected by Karen Aiken-smoot

  20. Apr 29, 2026

    Release to power company

    Inspected by Mgarber

  21. May 1, 2026

    Submitted Power Release through FPL Portal

    Inspected by Ward, Emaleigh C.

  22. Jun 17, 2026

    Passed: Building - Final

    *all Requirements Met To Release Power & Co-- 6.25.26 Mg

    Inspected by Matt Forsyth

Documents