Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Right-of-Way Access/Driveway Permit

Address 4112 SW ICHETUCKNEE AVE
Parcel #: 00479-203
Acres:
Owner: Parnell Ana I, Parnell Anthony Glenn Jr
Subdivision: Darwin L Perry
Zoning:
Flood Zone:
District:
Application #: 74110
Permit #: 000054467
Related Permit:
Submitted: Friday, October 31, 2025
Issued: Thursday, November 13, 2025
Expires: Sunday, November 12, 2028
Completed:
Status: Permit Issued
Septic Release? na
Notes:

Job Details
Finished floor requirement
Standards Driveway construction shall conform to the approved plan
Requirements An 18” storm pipe of approved material is required with a minimum length of 32 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long
Status Permanent
Type of connection for access road Rural Driveway
Type of construction of property Mobile Home
Normal vehicle usage: Automobiles
Side Drain required Yes
Side Drain Size 18
Study Required No
Estimated Number of Vehicle trips per day 2
Is the access for commercial or residential use? Residential
County Road Type Paved
Review Notes
10/31/2025 Application submitted by applicant.
10/31/2025 Pending Public Works Application Approval
11/3/2025 Application Approved by Public Works
11/10/2025 Pending initial driveway inspection
11/13/2025 Permit Issued
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Passed: Engineering - ROW Access/Driveway connects to county maintained road Chad Williams 11/3/2025
Passed: Engineering - Initial Driveway Smith, Blake 11/13/2025
Documents
File Name Date File Size
Image.jpg 2025.11.19 3.51MB
Original Permit 20251113.pdf 2025.11.19 37.48kB
300-2_pavedwithculvert.pdf 2025.11.19 186.45kB
Inspections Checklist.pdf 2025.11.19 101.62kB
Driveway_application_drawing.jpg 2025.11.06 157.75kB
Application.pdf 2025.11.06 32.30kB
Columbia County Fl - Right-of-way Access Driveway Invoice-74110.pdf 2025.11.06 42.45kB