Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Generator Permit

Address 180 SW BRIARBROOK PL
LAKE CITY, FL 32024
Parcel #: 03121-043
Acres: 4.30
Owner: Holden Toni T,
Subdivision: Piccadilly Park South
Zoning: ESA-2
Flood Zone: AE
District: 5
Application #: 74200
Permit #: 000054442
Related Permit:
Submitted: Monday, November 10, 2025
Issued: Monday, November 10, 2025
Expires: Tuesday, December 2, 2025
Completed: Tuesday, December 2, 2025
Status: Completed
Septic Release? No
Notes:
FINAL EC RECEIVED. OK FOR FINAL INSPECTION. KAS
Job Details
Elevation regulation Special Flood Hazard Area
Finished floor requirement 67.7 One foot above FEMA Map Elevation
Requirement needed By Final Inspection
Document needed is an Elevation Certificate for Finished Construction
Document receieved Yes
Fema map number 12023C0381D
In floodway Y
Residential or Commercial? Residential
What is the power service for? Existing Site Built Home
Other job details: Generator Installation
Meter or Account: Meter
Meter or Account #: 156 219 030
Number of requested AMPS for electrical service: 200
Septic # (00-0000) or (X00-000) 25-000
Electrical Code Edition 2020 National Electrical Code
Review Notes
11/10/2025 Application pending.
11/10/2025 Application submitted by applicant.
11/10/2025 Final Review - Processing
11/10/2025 Final Review - Payment Needed
11/10/2025 Permit Issued
12/2/2025 Permit Status Update Notification
Contractors
Name/ Business License Title Role
Donald R Hollingsworth
Holly Electric Inc
EC13005429 Electrical Contractor
Inspections
Inspection Notes Performed By Date
Failed: Electrical - Generator Final Need Final Photos From Contractor To Complete Gary Pitzer 12/2/2025