Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Storage Building Permit

Address 430 NW MULE WAY
LAKE CITY, FL 32055
Parcel #: 01770-241
Acres: 2.57
Owner: Mullins Lafarious, Mullins Thayla D
Subdivision: Joyce's Gem Replat Of Lot 1 Blk B Country Lane Est
Zoning: A-3
Flood Zone: X
District: 1
Application #: 73459
Permit #: 000054405
Related Permit:
Submitted: Thursday, September 25, 2025
Issued: Wednesday, November 5, 2025
Expires: Wednesday, May 13, 2026
Completed:
Status: Final Review - Complete
Septic Release? Yes
Notes:
*NON-HABITABLE STRUCTURE *NEW SLAB, NO MEP
Job Details
Finished floor requirement
Standards Driveway construction shall conform to the approved plan
Requirements An 18” storm pipe of approved material is required with a minimum length of 32 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long
Status Permanent
Type of connection for access road Drainage
Type of construction of property Mobile Home
Normal vehicle usage: Automobiles
Side Drain required Yes
Side Drain Size 18
Study Required No
Estimated Number of Vehicle trips per day 0
Is the access for commercial or residential use? Residential
County Road Type Paved
Review Notes
9/25/2025 Application pending.
9/25/2025 Point Review - Printed-Online Application
9/25/2025 Point Review - Pre-submittal Review Notes
10/3/2025 Point Review - Pre-submittal Review Notes
10/3/2025 Point Review - Pre-submittal Review Notes
10/10/2025 Point Review - Pre-submittal Review Notes
10/21/2025 Point Review - Ready for applicant submittal
10/21/2025 Application submitted by applicant.
10/21/2025 Point Review - Processing
10/31/2025 Zoning Review - Sent for Zoning Review
10/31/2025 Plan Review - Sent to plan review
10/31/2025 Zoning Review - Sent for Zoning Review
10/31/2025 Application submitted by applicant.
10/31/2025 Zoning Review - Reviewed
11/5/2025 Plan Review - Building Approved
11/5/2025 Plan Review - Reviewed
11/5/2025 Final Review - Sent for final review
11/5/2025 Permit Issued
11/5/2025 Final Review - Complete
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Septic Release Inspection Health Dept 10/30/2025
Passed: Building - Monolithic Slab Christian Allen 11/14/2025
Passed: Engineering - Setbacks Christian Allen 11/14/2025