Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Storage Building Permit

Address 430 NW MULE WAY
LAKE CITY, FL 32055
Parcel #: 01770-241
Acres: 2.57
Owner: Mullins Lafarious, Mullins Thayla D
Subdivision: Joyce's Gem Replat Of Lot 1 Blk B Country Lane Est
Zoning: A-3
Flood Zone: X
District: 1
Application #: 73459
Permit #: 000054405
Related Permit:
Submitted: Thursday, September 25, 2025
Issued: Wednesday, November 5, 2025
Expires: Wednesday, May 13, 2026
Completed:
Status: Final Review - Complete
Septic Release? Yes
Notes:
*NON-HABITABLE STRUCTURE *NEW SLAB, NO MEP
Job Details
Finished floor requirement
Fema map number 12023C0513C
In floodway N
Building Permit # 000040739
Standards Shall conform to Public Works Determinations as stated below
Requirements Install min, 32 ' × 18 " corr metal culvert w / concrete mitred ends, w / 6 " × 6 " welded wire, rebar or culvert bolts in mitred ends, concrete mitred ends W - 4ft x L - 5ft, and with 4 inches of limerock on top cover.
Status Approved
Review Notes
9/25/2025 Application pending.
9/25/2025 Point Review - Printed-Online Application
9/25/2025 Point Review - Pre-submittal Review Notes
10/3/2025 Point Review - Pre-submittal Review Notes
10/3/2025 Point Review - Pre-submittal Review Notes
10/10/2025 Point Review - Pre-submittal Review Notes
10/21/2025 Point Review - Ready for applicant submittal
10/21/2025 Application submitted by applicant.
10/21/2025 Point Review - Processing
10/31/2025 Zoning Review - Sent for Zoning Review
10/31/2025 Plan Review - Sent to plan review
10/31/2025 Zoning Review - Sent for Zoning Review
10/31/2025 Application submitted by applicant.
10/31/2025 Zoning Review - Reviewed
11/5/2025 Plan Review - Building Approved
11/5/2025 Plan Review - Reviewed
11/5/2025 Final Review - Sent for final review
11/5/2025 Permit Issued
11/5/2025 Final Review - Complete
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Septic Release Inspection Health Dept 10/30/2025
Passed: Building - Monolithic Slab Christian Allen 11/14/2025
Passed: Engineering - Setbacks Christian Allen 11/14/2025
Documents
File Name Date File Size