Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Solar Power System Permit

Address 571 SW WORRY FREE GLN
FORT WHITE, FL 32038
Parcel #: 04328-001
Acres: 5.29
Owner: Bachman Mark,
Subdivision:
Zoning: A-3
Flood Zone: X
District: 2
Application #: 71959
Permit #: 000054384
Related Permit: Site Use Approval: SITE-USE2025-129
Submitted: Tuesday, July 8, 2025
Issued: Monday, November 3, 2025
Expires: Monday, May 11, 2026
Completed:
Status: Permit Issued
Septic Release? na
Notes:
*GROUND MOUNTED SOLAR ARRAY
Job Details
Finished floor requirement
Fema map number 12023C0527C
PV Type Utility Interactive PV System- (DC to AC with utility connection)
Grounding N.E.C. Chapter 690
AC Options USE-2
AC Options (Cont..) In Conduit
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Power Company Clay Electric
Residential or Commercial? Residential
Setbacks Front 30'
Setback Side 1 25'
Setbacks Side 2 25'
Setbacks Rear 25'
Where are the panels mounted? Ground Mounted
Service Amps 200
Review Notes
7/8/2025 Application pending.
7/10/2025 Point Review - Pre-submittal Review Notes
7/11/2025 Application submitted by applicant.
7/15/2025 Point Review - Pre-submittal Review Notes
7/15/2025 Point Review - Pre-submittal Review Notes
7/15/2025 Point Review - Pre-submittal Review Notes
7/15/2025 Point Review - Pre-submittal Review Notes
7/30/2025 Point Review - Ready for applicant submittal
7/30/2025 Point Review - Reviewed
7/30/2025 Zoning Review - Reviewed
7/31/2025 Plan Review - Documents Required
8/1/2025 Plan Review - Documents Required
8/4/2025 Plan Review - Documents Required
8/13/2025 Plan Review - Documents Required
8/26/2025 Plan Review - Documents Required
8/27/2025 Plan Review - Documents Required
9/1/2025 Plan Review - Documents Required
9/5/2025 Plan Review - Documents Required
9/9/2025 Plan Review - Documents Required
9/10/2025 Plan Review - Documents Required
9/11/2025 Plan Review - Documents Required
9/14/2025 Plan Review - Documents Required
9/16/2025 Plan Review - Documents Required
9/21/2025 Plan Review - Documents Required
9/25/2025 Plan Review - Documents Required
9/28/2025 Plan Review - Documents Required
10/6/2025 Plan Review - Sent to plan review
10/9/2025 Plan Review - Reviewed
10/9/2025 Final Review - Sent for final review
10/28/2025 Final Review - Documents Required
10/30/2025 Final Review - Reviewed
10/30/2025 Final Review - Payment Needed
11/3/2025 Permit Issued
Contractors
Name/ Business License Title Role
David A Guerrero
D & D Servicing Llc
EC13014570 Cert. Electrical Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Christian Allen 11/12/2025
Passed: Engineering - Setbacks Christian Allen 11/12/2025
Passed: Electrical - Permanent Power Christian Allen 11/12/2025
Release to power company Christian Allen 11/12/2025
Passed: Building - Footer Christian Allen 11/12/2025
Passed: Engineering - Setbacks Christian Allen 11/12/2025
Passed: Electrical - Permanent Power Christian Allen 11/12/2025
Release to power company Christian Allen 11/12/2025