Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 128 SW CAPTAINS GLN
LAKE CITY, FL 32025
Parcel #: 02935-206
Acres: 2.27
Owner: Canter Roy G & Teresa L Living Trust
Subdivision: Cannon Creek Est Replat Lot 9
Zoning: RSF-2
Flood Zone: AE
District: 5
Application #: 73108
Permit #: 000054378
Related Permit:
Submitted: Monday, September 8, 2025
Issued: Friday, October 31, 2025
Expires: Wednesday, August 5, 2026
Completed:
Status: Permit Status Update Notification
Septic Release? No
Notes:
*MFE = ONE FOOT ABOVE THE ROAD *EXISTING DWELLING MUST BE BROUGHT FROM 1200 LIVEABLE SQFT TO 800 SQFT, DWELLINGS MUST SHARE POWER SOURCE *FINAL SEPTIC REQUIRED PRIOR TO RELEASE OF POWER *BLOWER DOOR AND FINAL TERMITE REQUIRED PRIOR TO CO
Job Details
Finished floor requirement
Fema map number 12023C0291D
Type Roofing Job Replacement - Tear off Existing and Replace
Further Job Details (Explain if decking is being replaced and or Repairs are being done.) Re-Roof 55sq - GAF Timberline HDZ architectural shingle/ 10/12 pitch
Type of structure House
Commercial or Residential Residential
Roof Area (for this job) Sq Ft 55
No. of Stories 1
Roof Pitch 4:12 or Greater
Is the existing roof being removed? Yes
Type of New Roofing Product Asphalt Shingles
Florida Product Approval Number FL10124
Product Manufacturer GAF
Product Description ARQUITECTURAL SHINGLES
Building Code Edition 2020 Florida Building Code 7th Edition and Florida Statute 553.844
Sealed roof decking options: (Must select an option.) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Ventilation: Ridge Vent
Flashing: Replace All
Drip Edge: Repair Existing
Valley Treatment: Use Existing
Review Notes
9/8/2025 Application pending.
9/8/2025 Point Review - Pre-submittal Review Notes
9/9/2025 Point Review - Pre-submittal Review Notes
9/11/2025 Point Review - Pre-submittal Review Notes
9/23/2025 Point Review - Pre-submittal Review Notes
9/24/2025 Point Review - Pre-submittal Review Notes
9/26/2025 Point Review - Pre-submittal Review Notes
9/28/2025 Point Review - Pre-submittal Review Notes
9/29/2025 Point Review - Pre-submittal Review Notes
10/1/2025 Point Review - Pre-submittal Review Notes
10/6/2025 Plan Review - Plumbing Approved
10/6/2025 Plan Review - Mechanical Approved
10/6/2025 Plan Review - Electrical Approved
10/6/2025 Plan Review - Building Approved
10/6/2025 Plan Review - Reviewed
10/6/2025 Point Review - Pre-submittal Review Notes
10/8/2025 Point Review - Pre-submittal Review Notes
10/8/2025 Point Review - Pre-submittal Review Notes
10/8/2025 Point Review - Pre-submittal Review Notes
10/10/2025 Zoning Review - Documents Required
10/13/2025 Zoning Review - Documents Required
10/29/2025 Point Review - Pre-submittal Review Notes
10/30/2025 Zoning Review - Documents Required
10/30/2025 Zoning Review - Reviewed
10/30/2025 Final Review - Reviewed
10/30/2025 Final Review - Payment Needed
10/31/2025 Permit Issued
11/14/2025 Permit Status Update Notification
Contractors
Name/ Business License Title Role
Tabitha M Sibel
Rjh Construction
CGC1515388 General Contractor Contractor
Robert Lynch
Third Day Electric Llc
Liability Insurance & Workers Comp Expired.
EC13001947 Cert. Electrical Subcontractor
Timothy D Shatto
Shatto Heating & Air, Inc.
CAC057875 A/c Class B Subcontractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Tabitha M Sibel
Rjh Construction
CCC1331967 Cert. Roofing Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Per Builder We Will Be Supplied With The House Placed On Wetland Delineation Tomorrow Am Showing The 35 Set Back Line Troy Crews 11/3/2025
Passed: Engineering - Setbacks Troy Crews 11/3/2025
Passed: Building - Footer Wetlands Set Back Has Been Marked By Surveyor Picture In File Troy Crews 11/24/2025
Passed: Plumbing/Gas - 1st Underground Rough–In Waste Pipe With Hvac Chase Observed Matt Forsyth 12/10/2025
Passed: Building - Slab Matt Forsyth 12/12/2025
Failed: Building - Ext Strapping/Wall Sheathing 1. Wall And Roof Sheathing Only, 2. Work Is Still In Progress On Framing And Strapping, 3. Few Small Areas Of Wall Sheathing In Progress Gary Pitzer 1/2/2026
Failed: Building - Framing Still In Progress Gary Pitzer 1/2/2026
Passed: Building - Roof Decking Matt Forsyth 1/9/2026
Passed: Building - Framing Matt Forsyth 1/21/2026
Passed: Building - Strapping Matt Forsyth 1/21/2026
Passed: Electrical - 1st Underground Rough–In Matt Forsyth 1/21/2026
Passed: Plumbing/Gas - 2nd Rough-In Upstairs Water Tested Matt Forsyth 1/21/2026
Failed: Mechanical - Rough In Not Complete Matt Forsyth 1/21/2026
Passed: Mechanical - Rough In Matt Forsyth 1/26/2026
Passed: Building - Insulation Matt Forsyth 2/6/2026
Documents
File Name Date File Size