Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Roof Replacement or Repair Permit

Address 250 SW CARMINE WAY
FORT WHITE, FL 32038
Parcel #: 04236-135
Acres: 1.47
Owner: Rose Brian E, Benefield Naomi J
Subdivision: Cedar Spring Shores Replat
Zoning: A-3
Flood Zone: X
District: 2
Application #: 73709
Permit #: 000054279
Related Permit:
Submitted: Friday, October 10, 2025
Issued: Monday, October 20, 2025
Expires: Wednesday, November 5, 2025
Completed: Wednesday, November 5, 2025
Status: Completed
Septic Release? na
Notes:

Job Details
Finished floor requirement
Fema map number 12023C0488C
Type Roofing Job Other
Further Job Details (Explain if decking is being replaced and or Repairs are being done.) Tear off existing metal and replace metal--currently metal over shingles.
Type of structure House
Commercial or Residential Residential
Roof Area (for this job) Sq Ft 1000
No. of Stories 1
Roof Pitch 2:12 to 4:12
Is the existing roof being removed? Yes
Type of New Roofing Product Metal
Florida Product Approval Number FL36904.2
Product Manufacturer Tri-County Metals
Product Description 26 Gauge Ultra Rib Metal
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.) Other (explain)
Sealed roof decking explanation for other option. Metal on 1x4s over existing single layer of shingles.
Ventilation: Ridge Vent
Flashing: Replace All
Drip Edge: Replace All
Valley Treatment: New Metal
Any cable and/or race-way wiring located on or within the roof assembly? No
Review Notes
10/10/2025 Application pending.
10/10/2025 Application submitted by applicant.
10/10/2025 Point Review - Documents Required
10/15/2025 Point Review - Processing
10/20/2025 Final Review - Payment Needed
10/20/2025 Permit Issued
10/20/2025 Final Review - Complete
Contractors
Name/ Business License Title Role
Robert Ogles
Ogles Roofing & Construction Llc
CCC1328699 Cert Roofing Contractor
Inspections
Inspection Notes Performed By Date
Passed: Re-Roof - In Progress Metal Over Anthony Aslan 10/31/2025
Passed: Re-Roof - Roof Affidavit Review Troy Crews 11/4/2025
Passed: Re-Roof - Roof Pictures Review In Future We Need Pictures With Bigger View Of Entire Project And Venting Method Troy Crews 11/4/2025
Passed: Re-Roof - Final Christian Allen 11/5/2025
(Requested) Re-Roof-Final