Mobile Home
Permit
| Application #: | 73440 |
| Permit #: |
000054270 |
| Related Permit: |
|
| Submitted: | Wednesday, September 24, 2025 |
| Issued: | Friday, October 17, 2025 |
| Expires: | Wednesday, November 12, 2025 |
| Completed: | Wednesday, November 12, 2025 |
| Status: |
Completed |
| Septic Release? |
Yes |
Notes
MFF = 1FT ABOVE ROADWAY.
Job Details
| Elevation regulation |
Minimum Requirement |
| Finished floor requirement |
One foot above the road |
| Fema map number |
12023C0370C |
| Mobile Home is a: |
Double Wide |
| Year Built |
2024 |
| Width (Ft.In) |
28 |
| Length (Ft.In) |
60 |
| Driveway access to home: |
Existing Drive |
| Installation Decal # |
122584 |
| Septic # |
25-0691 |
| Setbacks Front |
30' |
| Setback Side 1 |
30' |
| Setbacks Rear |
25' |
| Setback Side 2 |
25' |
| Are you applying for a 5 year temporary permit? |
No |
| Serial # |
FLTHLCT28215G4608AB |
| Wind Zone? |
2 |
| Service Amps |
200 |
| How many of bedrooms does this home have? |
4 |
| How many bathrooms does this home have? |
2 |
Review Notes
| 9/24/2025 |
Application pending. |
| 9/25/2025 |
Point Review - Pre-submittal Review Notes |
| 10/14/2025 |
Application submitted by applicant. |
| 10/16/2025 |
Zoning Review - Sent for Zoning Review |
| 10/16/2025 |
Plan Review - Sent to plan review |
| 10/16/2025 |
Plan Review - Reviewed |
| 10/16/2025 |
Zoning Review - Sent for Zoning Review |
| 10/16/2025 |
Zoning Review - Documents Required |
| 10/16/2025 |
Zoning Review - Reviewed |
| 10/17/2025 |
Final Review - Payment Needed |
| 10/17/2025 |
Permit Issued |
| 10/17/2025 |
Final Review - Complete |
Contractors
| Name / Business |
License |
Title |
Role |
Jacob Trowell Trowell's Mobile Home Set Up Llc
|
IH1148380 |
Mh Installer (ih) |
Contractor |
William Pringle Action Signs & Graphics Inc
|
EC13015190 |
Cert. Electrical |
Subcontractor |
Michael A Boland Ace A/c Of Ocala Llc
|
CAC1817716 |
Cert Class B A/c |
Subcontractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Mobile Home - Mobile Home Set-Up Final |
All Requirements Met To Release Power And Co-- 11.12.25 Mg |
Matt Forsyth |
11/6/2025 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
11/6/2025 |
| Septic Release Inspection |
|
Health Dept |
11/10/2025 |
| Release to power company |
|
Mgarber |
11/12/2025 |