Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Remodel Permit

Address 180 E DUVAL ST
LAKE CITY, FL 32055
Parcel #: 12736-000
Acres: 1.15
Owner: Columbia County, Florida,
Subdivision:
Zoning:
Flood Zone: X
District: 1
Application #: 73535
Permit #: 000054209
Related Permit:
Submitted: Tuesday, September 30, 2025
Issued: Tuesday, October 7, 2025
Expires: Wednesday, May 13, 2026
Completed:
Status: Permit Issued
Septic Release? No
Notes:

Job Details
Finished floor requirement
Standards Driveway construction shall conform to the approved plan
Requirements An 18” storm pipe of approved material is required with a minimum length of 32 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long
Status Permanent
Type of connection for access road Rural Driveway
Type of construction of property Mobile Home
Normal vehicle usage: Automobiles
Side Drain required Yes
Side Drain Size 18
Study Required No
Estimated Number of Vehicle trips per day 2
Is the access for commercial or residential use? Residential
County Road Type Paved
Review Notes
9/30/2025 Application pending.
9/30/2025 City of Lake City Utilities Notified.
9/30/2025 Point Review - On Hold-Incomplete
9/30/2025 Application submitted by applicant.
9/30/2025 Point Review - Documents Required
10/1/2025 Zoning Review - Reviewed
10/1/2025 Plan Review - Plumbing Approved
10/1/2025 Plan Review - Mechanical Approved
10/1/2025 Plan Review - Electrical Approved
10/1/2025 Plan Review - Building Approved
10/1/2025 Plan Review - Reviewed
10/1/2025 Final Review - Documents Required
10/1/2025 Application submitted by applicant.
10/1/2025 Point Review - Processing
10/6/2025 Final Review - Documents Required
10/7/2025 Permit Issued
Contractors
Name/ Business License Title Role
John G Oneal
Oneal Roofing Company
CCC1329495 Roofing Contractor Contractor
Mark Dawson
Paradise Plumbing Services, Llc.
CFC1427245 Plumbing Contractor Subcontractor
David P Wood
Woods Electrical Services Inc
EC13002213 Electrical Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Plumbing/Gas - 1st Underground Rough–In Waste Lines Only Front Bathroom Troy Crews 11/4/2025
Passed: Building - Framing Troy Crews 11/14/2025
Passed: Electrical - 2nd Rough-In Troy Crews 11/14/2025
Passed: Plumbing/Gas - 2nd Rough-In Troy Crews 11/14/2025
Documents
File Name Date File Size