Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Mobile Home Permit

Address 449 SW FREEDOM CT
FORT WHITE, FL 32038
Parcel #: 03865-017
Acres: 5.01
Owner: Jones Randy Dwayne, Jones Cherie Annette
Subdivision: Ichetucknee Meadows
Zoning: A-3
Flood Zone: X
District: 2
Application #: 73061
Permit #: 000054205
Related Permit:
Submitted: Thursday, September 4, 2025
Issued: Monday, October 6, 2025
Expires: Tuesday, December 16, 2025
Completed: Tuesday, December 16, 2025
Status: Completed
Septic Release? Yes
Notes:
*MFE = 32" ABOVE THE ADJACENT GROUND FOR THE ENTIRE PERIMETER OF THE FOUNDATION *FINAL SEPTICE REQUIRED PRIOR TO RELEASE OF POWER AND CO
Job Details
Elevation regulation Engineers Elevation Letter
Finished floor requirement 32" above adjacent ground for entire perimeter
Fema map number 12023C0459C
Mobile Home is a: Double Wide
Year Built 2025
Width (Ft.In) 32
Length (Ft.In) 80
Driveway access to home: Existing Drive
Installation Decal # 119738
Septic # (00-0000) or (X00-000) 25-0738
Setbacks Front 30'
Setback Side 1 25'
Setbacks Rear 25'
Setback Side 2 25'
Are you applying for a 5 year temporary permit? No
Serial # ALFHJ37518429AB
Wind Zone? 2
Residential or Commercial Use? Residential
Service Amps 200
How many of bedrooms does this home have? 3
How many bathrooms does this home have? 2
Review Notes
9/4/2025 Application pending.
9/5/2025 Point Review - Pre-submittal Review Notes
9/5/2025 Point Review - Processing
9/15/2025 Point Review - Pre-submittal Review Notes
9/25/2025 Point Review - Pre-submittal Review Notes
10/6/2025 Point Review - Ready for applicant submittal
10/6/2025 Application submitted by applicant.
10/6/2025 Point Review - Reviewed
10/6/2025 Zoning Review - Reviewed
10/6/2025 Plan Review - Reviewed
10/6/2025 Final Review - Reviewed
10/6/2025 Final Review - Payment Needed
10/6/2025 Permit Issued
10/6/2025 Final Review - Complete
Contractors
Name/ Business License Title Role
Glenn Whittington
Whittington Electric Inc
EC13002957 Electrical Contractor Subcontractor
Steven M Mollman
Mollman Air Conditioning And Refrigeration Llc
CAC1819696 Cert. A/c Class “b” Subcontractor
John Harden
Jh Contracting Llc
IH1150540 Mh Installer (ih) Contractor
Inspections
Inspection Notes Performed By Date
Septic Release Inspection Health Dept 11/24/2025
Passed: Mobile Home - Mobile Home Set-Up Final All Requirements Met To Release Co-- 12.16.25 Mg Matt Forsyth 12/12/2025
Release to power company Matt Forsyth 12/12/2025
Passed: Engineering - Setbacks Matt Forsyth 12/12/2025
Documents