Permit Details

Permit Search

Permit

Mobile Home

221 SW HORSE WAY
LAKE CITY, FL 32024

Permit #
000054181
Application #
73263
Status Completed
  1. Submitted Sep 15, 2025
  2. Issued Oct 1, 2025
  3. Expires Apr 27, 2026
  4. Completed Oct 30, 2025

Property

Parcel #
00407-106
Owner
Pitts Cody W, Pitts Misty D
Acres
2.92
Subdivision
Cypress Lake Hills
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0360C
Mobile Home is a:
Double Wide
Year Built
2026
Width (Ft.In)
28
Length (Ft.In)
48
Driveway access to home:
Existing Drive
Installation Decal #
121222
Special temporary use permit number:
STU250805
Septic #
25-0760
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
Yes
Serial #
WHC033327GAABAC
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200
How many of bedrooms does this home have?
3
How many bathrooms does this home have?
2

Status & Review History

  1. Application pending.
  2. Point Review - Processing
  3. Point Review - Pre-submittal Review Notes
  4. Point Review - Pre-submittal Review Notes
  5. Point Review - Pre-submittal Review Notes
  6. Point Review - Pre-submittal Review Notes
  7. Application submitted by applicant.
  8. Zoning Review - Complete
  9. Plan Review - Complete
  10. Final Review - Payment Needed
  11. Permit Issued
  12. Final Review - Complete

Contractors

  • John Harden

    Jh Contracting Llc

    License
    IH1150540
    Title
    Mh Installer (ih)
    Role
    Contractor

    Liability Insurance & Workers Comp Expired.

  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Steven M Mollman

    Mollman Air Conditioning And Refrigeration Llc

    License
    CAC1819696
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

Inspections

  1. Oct 10, 2025

    Septic Release Inspection

    Inspected by Health Dept

  2. Oct 29, 2025

    Passed: Mobile Home - Mobile Home Set-Up Final

    Inspected by Troy Crews

  3. Oct 29, 2025

    Release to power company

    Inspected by Troy Crews

  4. Oct 29, 2025

    Passed: Engineering - Setbacks

    Inspected by Troy Crews