Permit Details

Permit Search

Permit

Roof Replacement or Repair

274 SE BALD EAGLE LOOP
LAKE CITY, FL 32025

Permit #
000054169
Application #
73354
Status Completed
  1. Submitted Sep 18, 2025
  2. Issued Sep 30, 2025
  3. Expires Apr 13, 2026
  4. Completed Oct 15, 2025

Property

Parcel #
09533-203
Owner
Bever Tiffany,
Acres
5.03
Subdivision
Olustee Creek Estates Unit 2
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0415C
Type Roofing Job
Overlay with Metal
Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
Metal over shingle
Type of structure
Mobile Home
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
2186
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
No
Explain if not removing the existing roofing material?
Placing metal over Shingles
Type of New Roofing Product
Metal
Florida Product Approval Number
FL46679.01
Product Manufacturer
Mission Metals
Product Description
metal
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Ventilation:
Off-ridge Vent
Flashing:
Replace All
Drip Edge:
Replace All
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Final Review - Payment Needed
  4. Failed to auto issue permit on credit card payment.
  5. Permit Issued
  6. Final Review - Complete

Contractors

  • Harry D Anderson Jr

    Southeastern Coatings & Waterproofing, Inc.

    License
    CCC1326114
    Title
    Roofing Contractor
    Role
    Contractor

Inspections

  1. Oct 6, 2025

    Passed: Re-Roof - In Progress

    In Progress Was Completed On 10/6/25

    Inspected by Gary Pitzer

  2. Oct 8, 2025

    Passed: Re-Roof - Roof Affidavit Review

    Inspected by Gary Pitzer

  3. Oct 8, 2025

    Passed: Re-Roof - Roof Pictures Review

    Inspected by Gary Pitzer

  4. Oct 15, 2025

    Passed: Re-Roof - Final

    No Access, ,no Answer At Door, Per Photos And Affidavits, New Metal Roof Covering On Manufactured Home

    Inspected by Gary Pitzer

  5. Oct 15, 2025

    Passed: Certificate - Release Certificate

    Inspected by Gary Pitzer