Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Commercial Construction Permit

Address 129 SW CHAD PL
LAKE CITY, FL 32025
Parcel #: 08874-001
Acres: 4.99
Owner: Hunter John B Revocable Trust Dated February 11, 2003, Hunter George D
Subdivision:
Zoning: CI
Flood Zone: X
District: 5
Application #: 70354
Permit #: 000054137
Related Permit: Site Use Approval: SITE-USE2025-086
Submitted: Tuesday, May 6, 2025
Issued: Thursday, February 12, 2026
Expires: Monday, September 14, 2026
Completed:
Status: Permit Reissued
Septic Release? Yes
Notes:
*SDP 250306 ZONING APPROVAL *V-241104 PARKING VARIANCE *FINISHED FLOOR 96.0 FT SURVEYOR CONFIRMATION AT SLAB *ASSESSMENTS OWED @ PERM POWER, FINAL SEPTIC REQUIRED PRIOR TO RELEASE OF POWER *CITY TAP INSPECTION REQUIRED PRIOR TO FINAL-- REQUEST THROUGH COUNTY
LAKE CITY UTLITY CUSTOMER SERVICE NOTES 06/11/25 A tap application for water service was approved by the utility department. Locates must be obtained to ensure that the existing utility infrastructure is not damaged or obstructed.
Job Details
Finished floor requirement
Fema map number 12023C0405C
Mobile Home is a: Double Wide
Year Built 1987
Width (Ft.In) 28
Length (Ft.In) 70
Driveway access to home: Existing Drive
Installation Decal # 83771
Septic # 22-0685
Dev Permit # F023-
Are you applying for a 5 year temporary permit? No
Serial # flhml 09012202 ab
Wind Zone? 2
Residential or Commercial Use? Residential
Review Notes
4/11/2025 Application pending.
5/6/2025 Application submitted by applicant.
5/6/2025 City of Lake City Utilities Notified.
5/7/2025 Point Review - Processing
5/7/2025 Zoning Review - Processing
5/7/2025 Plan Review - Documents Required
5/7/2025 Final Review - Status Cleared
5/12/2025 Plan Review - Documents Required
5/14/2025 Zoning Review - Reviewed
5/14/2025 Plan Review - Documents Required
5/14/2025 Plan Review - Documents Required
5/19/2025 Plan Review - Documents Required
6/3/2025 Plan Review - Documents Required
6/4/2025 Plan Review - Documents Required
6/6/2025 Plan Review - Documents Required
6/9/2025 Plan Review - Documents Required
6/10/2025 Plan Review - Documents Required
6/12/2025 Plan Review - Documents Required
6/16/2025 Plan Review - Documents Required
6/16/2025 Plan Review - Documents Required
6/17/2025 Plan Review - Documents Required
6/18/2025 Plan Review - Documents Required
6/23/2025 Plan Review - Documents Required
6/24/2025 Plan Review - Documents Required
6/24/2025 Plan Review - Documents Required
6/24/2025 Plan Review - Documents Required
6/26/2025 Plan Review - Documents Required
6/26/2025 Point Review - Processing
6/30/2025 Plan Review - Documents Required
7/7/2025 Plan Review - Documents Required
7/14/2025 Plan Review - Documents Required
7/20/2025 Plan Review - Documents Required
7/21/2025 Plan Review - Documents Required
7/29/2025 Plan Review - Documents Required
7/30/2025 Plan Review - Documents Required
7/31/2025 Plan Review - Documents Required
8/11/2025 Zoning Review - Reviewed
8/11/2025 Point Review - Processing
8/11/2025 Plan Review - Plumbing Approved
8/11/2025 Plan Review - Mechanical Approved
8/11/2025 Plan Review - Electrical Approved
8/11/2025 Plan Review - Building Approved
8/11/2025 Plan Review - Reviewed
8/11/2025 Final Review - Documents Required
8/13/2025 Final Review - Documents Required
8/26/2025 Final Review - Documents Required
9/1/2025 Final Review - Documents Required
9/4/2025 Final Review - Documents Required
9/8/2025 Final Review - Documents Required
9/9/2025 Final Review - Documents Required
9/10/2025 Final Review - Documents Required
9/11/2025 Final Review - Documents Required
9/14/2025 Final Review - Documents Required
9/16/2025 Final Review - Documents Required
9/21/2025 Final Review - Documents Required
9/23/2025 Final Review - Reviewed
9/23/2025 Final Review - Payment Needed
9/24/2025 Permit Issued
2/12/2026 Permit Reissued
Contractors
Name/ Business License Title Role
Christopher Dooley
Dooley And Mack Constructors Of Georgia Inc
CGC1508635 Cert. General Contractor
Benjamin L Sparks
Line Electric Company Llc
EC13009101 Cert. Electrical Subcontractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
John G Gable
1 Clear Choice Heat And Air, Llc
CAC1820328 Cert. Mechanical Subcontractor
Inspections
Inspection Notes Performed By Date
Failed: Fire - Plan Review Unable To Review Suppression System In Plans. Please Attach Plans For Approval. Cpt. Shane Overstreet 6/16/2025
Passed: Fire - Plan Review Cpt. Shane Overstreeet 7/30/2025
Release to power company Temp Pole Tcrews 10/15/2025
Passed: Electrical - Temporary Power Service Troy Crews 10/15/2025
Passed: Building - Footer Troy Crews 11/14/2025
Passed: Engineering - Setbacks Troy Crews 11/14/2025
Passed: Plumbing/Gas - 1st Underground Rough–In Troy Crews 11/18/2025
Passed: Building - Slab Reminder Have Surveyor To Do Elevation Confirmation Letter Troy Crews 11/24/2025
Passed: Building - Masonry Wall Reinforcing Add Steel To Three Spots Each Side Of Front Door Opening And Corner Of West Wall Troy Crews 12/1/2025
Cancelled: Building - Masonry Wall Reinforcing Tcrews 12/2/2025
Cancelled: Building - Masonry Wall Reinforcing Tcrews 12/3/2025
Passed: Building - Masonry Wall Reinforcing Second Partial West Wall And South Wall Troy Crews 12/4/2025
Passed: Building - Masonry Wall Reinforcing 3rd Lift West And South Wall Troy Crews 12/8/2025
Passed: Building - Masonry Wall Reinforcing 4th Lift On Southwest Wall And Top Out Of South Wall Troy Crews 12/10/2025
Passed: Building - Masonry Wall Reinforcing Top Out On South Wall 3rd Lift On East Wall Troy Crews 12/12/2025
Passed: Building - Masonry Wall Reinforcing Top Out Se Corner 2nd Lift East Wall Troy Crews 12/15/2025
Passed: Building - Masonry Wall Reinforcing 3rd Left E Wall Troy Crews 12/17/2025
Passed: Building - Masonry Wall Reinforcing 4th Lift On West And East Wall Troy Crews 12/19/2025
Passed: Electrical - 1st Underground Rough–In Main Service Conduit And Parking Lot Lights Troy Crews 1/6/2026
Passed: Building - Footer Monolithic Slab Dumpster Enclosure With Bollards Troy Crews 1/12/2026
Passed: Building - Rated Assembly Fastening Framing For Front Entryway Troy Crews 1/13/2026
Passed: Building - Roof Decking Plywood At Back Of Framing For Front Entry Troy Crews 1/13/2026
Passed: Building - Ext Strapping/Wall Sheathing Front Entryway Framing And Sheathing Troy Crews 1/20/2026
Passed: Building - Framing Troy Crews 1/20/2026
Passed: Plumbing/Gas - 2nd Rough-In Office Area And Outside Hose Bibs Troy Crews 1/23/2026
Passed: Electrical - 2nd Rough-In Office Area And Exterior Wall Outlets Troy Crews 1/23/2026
Passed: Building - Framing Exterior Walls Hat Channel Troy Crews 1/23/2026
Passed: Building - Insulation Foam Insulation Exterior Walls Between Hat Channel Troy Crews 1/23/2026
Passed: Building - Footer Foundation Holes For Garden Center Canopy Troy Crews 1/27/2026
Passed: Engineering - Setbacks Troy Crews 1/27/2026
Passed: Mechanical - Rough In Ductwork Office And Bathroom Areas Troy Crews 2/13/2026
Passed: City of Lake City Utilities - Lake City Utilities Tap Inspection City Of Lake City Distribution And Collections Department 2/25/2026
Failed: Electrical - Permanent Power Not Ready Troy Crews 3/5/2026
Passed: Electrical - Above Ceiling Troy Crews 3/18/2026
Passed: Mechanical - Framing/Fire Damper Mechanical Above Ceiling No Fire Dampers Required Troy Crews 3/18/2026
Passed: Electrical - Permanent Power Need Fire And Garbage Assessments And Double Check On City Water And Sewer Troy Crews 3/18/2026
Release to power company Mgarber 3/20/2026
Septic Release Inspection All Requirements Met To Release Power-- 3.20.26 Mg Health Dept 3/20/2026