| Inspection |
Notes |
Performed By |
Date |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
Dvw Piping No Clean Out |
Gary Pitzer |
10/13/2025 |
| Passed: Engineering - Setbacks |
|
Gary Pitzer |
10/16/2025 |
| Failed: Building - Monolithic Slab |
1.all Steel In Bond Beams Need To Be Wire In Position To Allow Cement To Flow Under, 2. All Steel In Place Under Your Turn Out Rebar Needs To Be On Top And Wired In Place, 3, Area That Was Termite Treatment Before The Digging Of Beam Pockets Will Require Retreated |
Gary Pitzer |
10/16/2025 |
| Failed: Building - Roof Decking |
Several Shiners Visiable |
Gary Pitzer |
11/14/2025 |
| Failed: Building - Strapping |
In Progres, But Not Complete |
Gary Pitzer |
11/14/2025 |
| Failed: Building - Framing |
In Progress, Not Complete |
Gary Pitzer |
11/14/2025 |
| Failed: Building - Ext Strapping/Wall Sheathing |
In Progress, Not Complete |
Gary Pitzer |
11/14/2025 |
| Passed: Building - Ext Strapping/Wall Sheathing |
|
Gary Pitzer |
12/22/2025 |
| Passed: Building - Roof Decking |
|
Gary Pitzer |
12/22/2025 |
| Passed: Electrical - 2nd Rough-In |
|
Gary Pitzer |
12/22/2025 |
| Failed: Plumbing/Gas - 2nd Rough-In |
Need Pressure Test On |
Gary Pitzer |
12/22/2025 |
| Passed: Mechanical - Rough In |
|
Gary Pitzer |
12/22/2025 |
| Failed: Building - Framing |
Everything Is Complete Except The Original Wall At The End That Connects To New Addition Whic We Are To Inspect After Home Is All Insulated And Weather Tight |
Gary Pitzer |
12/22/2025 |
| Failed: Building - Strapping |
Strapping And Supporting That Will Not Happen Until The Existing Wall Is Removed And A New Cross Support Wall Is Complete |
Gary Pitzer |
12/22/2025 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Gary Pitzer |
12/23/2025 |
| Passed: Building - Insulation |
Walls And Roof Spray Foam |
Troy Crews |
1/8/2026 |