Failed: Building - Monolithic Slab
1.all Steel In Bond Beams Need To Be Wire In Position To Allow Cement To Flow Under, 2. All Steel In Place Under Your Turn Out Rebar Needs To Be On Top And Wired In Place, 3, Area That Was Termite Treatment Before The Digging Of Beam Pockets Will Require Retreated
Inspected by Gary Pitzer