Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Roof Replacement or Repair Permit

Address 588 SW WALTER AVE
LAKE CITY, FL 32024
Parcel #: 03425-013
Acres: 2.01
Owner: Gt Executive Services Llc,
Subdivision:
Zoning: A-3
Flood Zone: X
District: 5
Application #: 73164
Permit #: 000054100
Related Permit:
Submitted: Tuesday, September 9, 2025
Issued: Friday, September 19, 2025
Expires: Wednesday, March 18, 2026
Completed:
Status: Final Review - Complete
Septic Release? na
Notes:

Job Details
Finished floor requirement
Fema map number 12023C0383D
Type Roofing Job Replacement - Tear off Existing and Replace
Type of structure House
Commercial or Residential Residential
Roof Area (for this job) Sq Ft 2100
No. of Stories 1
Roof Pitch 2:12 to 4:12
Is the existing roof being removed? Yes
Type of New Roofing Product Asphalt Shingles
Florida Product Approval Number fl 10124
Product Manufacturer timberline
Product Description HDZ laminated
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.) a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Ventilation: Unvented
Flashing: Replace All
Drip Edge: Replace All
Valley Treatment: New Metal
Review Notes
9/9/2025 Application pending.
9/18/2025 Application submitted by applicant.
9/18/2025 Final Review - Documents Required need *Upload Sunbiz doc *Owner Disclosure Statement
9/19/2025 Final Review - Documents Required UPLOAD SUNBIZ DOC OWNER DISCLOSURE STATEMENT
9/19/2025 Point Review - Processing
9/19/2025 Final Review - Payment Needed
9/19/2025 Final Review - Payment Needed
9/19/2025 Permit Issued Permit #000054100 created and approved.
9/22/2025 Final Review - Complete
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date