Mobile Home
Permit
| Application #: | 73116 |
| Permit #: |
000054099 |
| Related Permit: |
|
| Submitted: | Monday, September 8, 2025 |
| Issued: | Friday, September 19, 2025 |
| Expires: | Wednesday, December 10, 2025 |
| Completed: | Wednesday, December 10, 2025 |
| Status: |
Completed |
| Septic Release? |
Yes |
Job Details
| Elevation regulation |
Minimum Requirement |
| Finished floor requirement |
Bottom of lowest beam must be one foot above the road |
| Fema map number |
12023C0190D |
| Mobile Home is a: |
Double Wide |
| Year Built |
2025 |
| Width (Ft.In) |
28 |
| Length (Ft.In) |
56 |
| Driveway access to home: |
Existing Drive |
| Installation Decal # |
121218 |
| Special temporary use permit number: |
STU250901 |
| Septic # |
25-0698 |
| Setbacks Front |
30' |
| Setback Side 1 |
25' |
| Setbacks Rear |
25' |
| Setback Side 2 |
25' |
| Are you applying for a 5 year temporary permit? |
Yes |
| Serial # |
FLTHLCT28191L4436AB |
| Wind Zone? |
2 |
| Residential or Commercial Use? |
Residential |
| Service Amps |
200 |
| How many of bedrooms does this home have? |
3 |
| How many bathrooms does this home have? |
2 |
Review Notes
| 9/8/2025 |
Application pending. |
| 9/9/2025 |
Point Review - Printed-Online Application |
| 9/15/2025 |
Point Review - Pre-submittal Review Notes |
| 9/18/2025 |
Point Review - Ready for applicant submittal |
| 9/18/2025 |
Application submitted by applicant. |
| 9/18/2025 |
Point Review - Reviewed |
| 9/18/2025 |
Zoning Review - Reviewed |
| 9/18/2025 |
Plan Review - Reviewed |
| 9/18/2025 |
Final Review - Processing |
| 9/19/2025 |
Final Review - Reviewed |
| 9/19/2025 |
Final Review - Payment Needed |
| 9/19/2025 |
Permit Issued |
| 9/19/2025 |
Final Review - Complete |
Contractors
| Name / Business |
License |
Title |
Role |
John Harden Jh Contracting Llc
|
IH1150540 |
Mh Installer (ih) |
Contractor |
Michael A Boland Ace A/c Of Ocala Llc
|
CAC1817716 |
Cert Class B A/c |
Subcontractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Engineering - Setbacks |
|
Gary Pitzer |
12/2/2025 |
| Failed: Mobile Home - Mobile Home Set-Up Final |
1,needed Septic Release, 2.need Bonding Wire Attached From One Unit To The Other Unit, 3. Need Anti Siphon Devices On Both Faucets Coming Out Of Ground. Please Forward Photos Of Bonding Wire Attached And Anti Siphon Devices To 386-292-0220. Thanks |
Gary Pitzer |
12/2/2025 |
| Passed: Engineering - Setbacks |
Septic No Aprroved |
Gary Pitzer |
12/3/2025 |
| Failed: Mobile Home - Mobile Home Set-Up Final |
Septic Is Not Completed |
Gary Pitzer |
12/3/2025 |
| Septic Release Inspection |
|
Health Dept |
12/9/2025 |
| Release to power company |
|
Ewilliams |
12/10/2025 |
| Passed: Mobile Home - Mobile Home Set-Up Final |
Failed Only Due To Septic Not Being Completed At Time Of Inspection - Passed Inspection Per Tc |
Ewilliams |
12/10/2025 |
| Passed: Engineering - Setbacks |
|
Emaleigh Williams |
12/10/2025 |