Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 288 SW CABOOSE DR
FORT WHITE, FL 32038
Parcel #: 04059-123
Acres: 0.51
Owner: Terry Craig A, Terry Lisa G
Subdivision: Fort White Station
Zoning:
Flood Zone: X
District: 2
Application #: 69962
Permit #: 000054064
Related Permit:
Submitted: Friday, July 25, 2025
Issued: Tuesday, September 16, 2025
Expires: Monday, June 15, 2026
Completed:
Status: Final Review - Complete
Septic Release? Yes
Notes:
*MFE = BOTTOM OF LOWEST BEAM MUST BE 1' ABOVE THE ROAD *FINAL SEPTIC REQUIRED PRIOR TO RELEASE OF POWER *ASSESSMENTS OWED @ PERM POWER, BLOWER DOOR AND FINAL TERMITE REQUIRED PRIOR TO CO
Job Details
Finished floor requirement
Fema map number 12023C0290D
This is the construction of a SFD/UTILITY
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Stories 1
Heated Area (Sqft) 2189.00
Total Area (Sqft) 3096.00
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Septic# (00-0000) or (X00-000) CITY
Review Notes
3/17/2025 Application pending.
7/29/2025 Point Review - Pre-submittal Review Notes
8/28/2025 Point Review - Pre-submittal Review Notes
9/2/2025 Point Review - Pre-submittal Review Notes
9/5/2025 Point Review - Pre-submittal Review Notes
9/11/2025 Point Review - Pre-submittal Review Notes
9/14/2025 Point Review - Ready for applicant submittal
9/15/2025 Point Review - Ready for applicant submittal
9/15/2025 Application submitted by applicant.
9/15/2025 Point Review - Reviewed
9/15/2025 Zoning Review - Reviewed
9/15/2025 Plan Review - Sent to plan review
9/16/2025 Plan Review - Plumbing Approved
9/16/2025 Plan Review - Mechanical Approved
9/16/2025 Plan Review - Electrical Approved
9/16/2025 Plan Review - Building Approved
9/16/2025 Plan Review - Reviewed
9/16/2025 Final Review - Sent for final review
9/16/2025 Final Review - Reviewed
9/16/2025 Final Review - Payment Needed
9/16/2025 Permit Issued
9/16/2025 Final Review - Complete
Contractors
Name/ Business License Title Role
Jeffrey P Bokor
Dwc Contracting Llc
Workers Comp Expired.
CGC1517145 General Contractor Contractor
James Butler Jr
Butler Plumbing Of Gainesville Inc
CFC057960 Plumbing Contractor Subcontractor
Jeffrey Bokor
Dwc Contracting Llc
Workers Comp Expired.
CCC1329756 Roofing Contractor Subcontractor
Ryan C Beville
Rbi Electrical Contracting Llc
EC13004236 Electrical Contractor Subcontractor
Samuel L Roberts
Air Ducks Inc
Liability Insurance Expired.
CAC1817288 Class "b" A/c Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Electrical - Temporary Power Service Anthony Aslan 9/17/2025
Passed: Plumbing/Gas - 1st Underground Rough–In Anthony Aslan 9/22/2025
Cancelled: Building - Footer Aaslan 9/24/2025
Passed: Building - Monolithic Slab Christian Allen 9/25/2025
Passed: Engineering - Setbacks Dwelling Appears To Be Within Set Back Christian Allen 9/25/2025
Release to power company Temp Pwr Ewilliams 9/29/2025
Passed: Building - Ext Strapping/Wall Sheathing Anthony Aslan 10/16/2025
Passed: Building - Roof Decking Anthony Aslan 10/16/2025
Passed: Electrical - 2nd Rough-In Anthony Aslan 10/16/2025
Passed: Building - Framing Christian Allen 10/27/2025
Passed: Plumbing/Gas - 2nd Rough-In Christian Allen 10/27/2025
Passed: Plumbing/Gas - Tub Set/Shower Pan Christian Allen 10/27/2025
Passed: Mechanical - Rough In Install Nail Plate For Dyer Exhaust Vent Stack On Top Plate ... Will Check At Next Inspection 10/27/2025
Passed: Building - Insulation Christian Allen 10/29/2025
Passed: Electrical - Permanent Power Septic Needed Matt Forsyth 12/17/2025
Release to power company Septic Rec'd Ewilliams 1/9/2026
Septic Release Inspection Health Dept 1/9/2026
(Requested) Above slab Rough-in
(Requested) Above slab Rough-in
(Requested) Above slab Rough-in
(Requested) Electrical Rough-in
(Requested) Framing
(Requested) Heat & AC
(Requested) Above slab Rough-in
(Requested) Electrical Rough-in
(Requested) Framing
(Requested) Heat & AC
(Requested) Perm Power
Documents
File Name Date File Size