Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Right-of-Way Access/Driveway Permit

Address SW BELLFLOWER DR
,
Parcel #: 02731-039
Acres: 0.00
Owner: Adams Homes Of Northwest Florida, Inc,
Subdivision:
Zoning:
Flood Zone:
District:
Application #: 72756
Permit #: 000054019
Related Permit: New Residential Construction: 000054161
Submitted: Monday, August 18, 2025
Issued: Wednesday, September 10, 2025
Expires: Saturday, September 9, 2028
Completed:
Status: Permit Issued
Septic Release? na
Notes:

Job Details
Elevation regulation Subdivision Plat
Finished floor requirement 125'
Requirement needed By Nailing Inspection
Document needed is a Surveyor letter giving the Finished Floor Elevation
Document receieved Yes
Fema map number 12023C0290D
This is the construction of a Single Family Dwelling
Setbacks Front 25'
Setback Side 1 10'
Setback Side 2 10'
Setbacks Rear 15'
Stories 1
Heated Area (Sqft) 1776
Total Area (Sqft) 2400
Building Height 18
Building Code Occupancy Types Residential
Occupancy Use Title single family dwelling
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000) x-city
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Review Notes
8/18/2025 Pending applicant completion and submission.
8/18/2025 Final Review - Corrections Needed
8/26/2025 Email confirmation reminder sent.
8/28/2025 Application submitted by applicant.
8/28/2025 Pending Public Works Application Approval
8/29/2025 Application Approved by Public Works
9/1/2025 Final Review - Payment Needed
9/2/2025 Final Review - Payment Needed
9/8/2025 Pending initial driveway inspection
9/10/2025 Permit Issued
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Passed: Engineering - ROW Access/Driveway connects to county maintained road Chad Williams 8/28/2025
Passed: Engineering - Initial Driveway Beach, Garrett 9/9/2025