Permit Details

Permit Search

Permit

New Residential Construction

258 SE RIPLEY PL
LAKE CITY, FL 32024

Permit #
000053997
Application #
71786
Status Completed
  1. Submitted Jun 30, 2025
  2. Issued Sep 8, 2025
  3. Expires Jan 27, 2027
  4. Completed Jul 31, 2026

Property

Parcel #
09784-105
Owner
Borchardt Gary A, Borchardt Sheri A
Acres
4.96
Subdivision
Shadow Wood Unit 2
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
SEE LETTER IN FILE
Requirement needed
By Nailing Inspection
Document needed is
Engineers letter
Document receieved
Yes
Fema map number
12023C0505C
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1.5
Heated Area (Sqft)
2753
Total Area (Sqft)
4107
Building Height
25
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
SINGLE FAMILY DWELLING
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
25-0613
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Point Review - Pre-submittal Review Notes
  3. Point Review - Pre-submittal Review Notes
  4. Point Review - Pre-submittal Review Notes
  5. Point Review - Pre-submittal Review Notes
  6. Point Review - Pre-submittal Review Notes
  7. Point Review - Pre-submittal Review Notes
  8. Point Review - Pre-submittal Review Notes
  9. Point Review - Ready for applicant submittal
  10. Point Review - Ready for applicant submittal
  11. Application submitted by applicant.
  12. Plan Review - Corrections Needed
  13. Plan Review - Building Approved
  14. Plan Review - Electrical Approved
  15. Plan Review - Mechanical Approved
  16. Plan Review - Plumbing Approved
  17. Plan Review - Fuel/Gas Approved
  18. Plan Review - Reviewed
  19. Zoning Review - Reviewed
  20. Final Review - Reviewed
  21. Final Review - Payment Needed
  22. Final Review - Payment Needed
  23. Final Review - Payment Needed
  24. Final Review - Payment Needed
  25. Permit Issued
  26. Final Review - Complete

Contractors

  • Caleb J Wentworth

    Wentworth Construction Services, Llc

    License
    CBC1266933
    Title
    Cert. Building
    Role
    Contractor

    County License & State License & Liability Insurance Expired.

  • Caleb J Wentworth

    Wentworth Construction Services, Llc

    License
    CCC1334975
    Title
    Cert. Roofing
    Role
    Subcontractor

    State License & Liability Insurance Expired.

  • Donald Davis

    High Springs Electric Inc

    License
    EC0002306
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Timothy D Shatto

    Shatto Heating & Air, Inc.

    License
    CAC057875
    Title
    A/c Class B
    Role
    Subcontractor
  • Darrel Knuth

    Preferred Plumbing Of Gainesville Llc

    License
    CFC1429311
    Title
    Cert. Plumbing
    Role
    Subcontractor

    County License & State License & Liability Insurance & Workers Comp Expired.

Inspections

  1. Sep 22, 2025

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Anthony Aslan

  2. Sep 29, 2025

    Failed: Building - Monolithic Slab

    No Compaction Results footings Washed In

    Inspected by Anthony Aslan

  3. Sep 29, 2025

    Cancelled: Engineering - Setbacks

    Inspected by Aaslan

  4. Oct 2, 2025

    Passed: Building - Monolithic Slab

    Inspected by Anthony Aslan

  5. Oct 21, 2025

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Christian Allen

  6. Oct 21, 2025

    Passed: Building - Roof Decking

    Inspected by Christian Allen

  7. Dec 5, 2025

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Christian Allen

  8. Dec 5, 2025

    Passed: Electrical - 2nd Rough-In

    Inspected by Christian Allen

  9. Dec 5, 2025

    Passed: Mechanical - Rough In

    Inspected by Christian Allen

  10. Dec 5, 2025

    Passed: Building - Strapping

    Inspected by Christian Allen

  11. Dec 5, 2025

    Failed: Building - Framing

    Engineering Letter Required For The Trusses Bored Through For Electrical In Bonus Room Above Garage

    Inspected by Christian Allen

  12. Dec 30, 2025

    Passed: Building - Framing

    Inspected by Christian Allen

  13. Jan 28, 2026

    Passed: Building - Insulation

    Inspected by Christian Allen

  14. Apr 27, 2026

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Inspected by Christian Allen

  15. May 26, 2026

    Septic Release Inspection

    Inspected by Health Dept

  16. May 27, 2026

    Passed: Electrical - Permanent Power

    Inspected by Christian Allen

  17. May 27, 2026

    Release to power company

    Inspected by Christian Allen

  18. Jul 18, 2026

    Cancelled: Certificate - Release Certificate

    Inspected by Tcrews

  19. Jul 20, 2026

    Failed: Building - Final

    Need As Built Letter From Engineer That Elevation Requirements Are Met, Per Letter

    Inspected by Troy Crews

  20. Jul 31, 2026

    Passed: Building - Final

    Inspected by Christian Allen

  21. Jul 31, 2026

    Passed: Certificate - Release Certificate

    Inspected by Christian Allen

  22. Jul 31, 2026

    Release to power company

    Inspected by Christian Allen

Documents