Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 513 SW MEADOWLANDS DR
LAKE CITY, FL 32024
Parcel #: 09617-222
Acres: 4.98
Owner: Anderson Dana M, Anderson Carol W
Subdivision: Meadowlands Phase 2
Zoning: A-3
Flood Zone: X
District: 4
Application #: 70942
Permit #: 000053989
Related Permit:
Submitted: Tuesday, July 29, 2025
Issued: Friday, September 5, 2025
Expires: Sunday, September 6, 2026
Completed:
Status: Permit Status Update Notification
Septic Release? No
Notes:
*MFE = 12" ABOVE THE ADJACENT GROUND FOR THE ENTIRE PERIMETER OF THE FOUNDATION *TRUSS ENGINEERING DEFERRED AND REQUIRED BY SLAB *FINAL SEPTIC REQUIRED PRIOR TO RELEASE OF POWER *ASSESSMENTS OWED @ PERM POWER, BLOWER DOOR AND FINAL TERMITE REQUIRED PRIOR TO CO
Job Details
Finished floor requirement
Fema map number 12023C0403C
Type Roofing Job Replacement - Tear off Existing and Replace
Further Job Details (Explain if decking is being replaced and or Repairs are being done.) Remove existing shingles and replace with GAF Architectural Shingles
Type of structure House
Commercial or Residential Residential
Roof Area (for this job) Sq Ft 5600
No. of Stories 1
Roof Pitch 4:12 or Greater
Is the existing roof being removed? Yes
Type of New Roofing Product Asphalt Shingles
Florida Product Approval Number FL.10124.R31
Product Manufacturer GAF
Product Description Architectural shingle
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Ventilation: Ridge Vent
Flashing: Replace All
Drip Edge: Replace All
Valley Treatment: New Metal
Any cable and/or race-way wiring located on or within the roof assembly? No
Review Notes
5/8/2025 Application pending.
7/30/2025 Point Review - Pre-submittal Review Notes
8/15/2025 Point Review - Pre-submittal Review Notes
8/18/2025 Point Review - Pre-submittal Review Notes
8/18/2025 Point Review - Pre-submittal Review Notes
8/26/2025 Plan Review - Documents Required
8/27/2025 Plan Review - Documents Required
8/27/2025 Plan Review - Plumbing Approved
8/27/2025 Plan Review - Mechanical Approved
8/27/2025 Plan Review - Electrical Approved
8/27/2025 Plan Review - Building Approved
8/27/2025 Plan Review - Building Approved
8/27/2025 Plan Review - Reviewed
8/27/2025 Final Review - Processing
8/28/2025 Zoning Review - Documents Required
9/1/2025 Final Review - Documents Required
9/4/2025 Zoning Review - Reviewed
9/4/2025 Final Review - Reviewed
9/4/2025 Final Review - Payment Needed
9/5/2025 Permit Issued
9/5/2025 Final Review - Payment Needed
9/5/2025 Final Review - Complete
2/13/2026 Permit Status Update Notification
2/13/2026 Permit Status Update Notification
Contractors
Name/ Business License Title Role
Dana M Anderson
Anderson Construction Industries, Inc
CGC023936 Cert. General Contractor
Donald R Hollingsworth
Holly Electric Inc
EC13005429 Electrical Subcontractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Clinton G Wilson
Wilson Heat & Air Inc
CAC057886 Class B A/c Subcontractor
Inspections
Inspection Notes Performed By Date
Failed: Electrical - Temporary Power Service No Access, Gates Chained And Locked, Reschedule, Please Have Gates Open For Inspection Gary Pitzer 10/13/2025
Passed: Electrical - Temporary Power Service Temp Post Oly Gary Pitzer 10/14/2025
Release to power company Temp Power Nanderson 10/17/2025
Cancelled: Building - Footer Tcrews 2/26/2026
Passed: Building - Footer Partial Footer For Stem Walls Only Gary Pitzer 2/26/2026
Passed: Engineering - Setbacks Gary Pitzer 2/26/2026
Passed: Building - Footer This Inspection Is For Perimeter Bond Beam That Has Steel In Place And Wired,--note--there Will Be Other Footer Inspection For House Footers After Fill Has Been Installed And Compacted, Owner Is Aware That Columbia County Needs A Compaction Report Gary Pitzer 3/10/2026
Documents
File Name Date File Size