Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Mobile Home Permit

Address 172 SW TRENTON TER
FORT WHITE, FL 32038
Parcel #: 01318-000
Acres: 0.92
Owner: Ga Nole, Llc
Subdivision: Three Rivers Estates Unit 21
Zoning: A-3
Flood Zone: X
District: 2
Application #: 71743
Permit #: 000053964
Related Permit: Site Use Approval: SITE-USE2025-175
Submitted: Monday, June 30, 2025
Issued: Tuesday, September 2, 2025
Expires: Thursday, October 23, 2025
Completed: Thursday, October 23, 2025
Status: Completed
Septic Release? Yes
Notes:
*MFE = 32" ABOVE THE ADJACENT GROUND FOR THE ENTIRE PERIMETER OF THE FOUNDATION PER ENGINEER LETTER *SEPTIC RELEASE REQUIRED PRIOR TO RELEASE OF POWER *REPLACING EXISTING MH, OLD MH MUST BE REMOVED PRIOR TO CO
Job Details
Elevation regulation Engineers Elevation Letter
Finished floor requirement 32" above the adjacent ground for entire perimeter
Fema map number 12023C0467C
Mobile Home is a: Double Wide
Year Built 2018
Width (Ft.In) 26.6
Length (Ft.In) 48
Driveway access to home: Existing Drive
Installation Decal # 48039
Septic # (00-0000) or (X00-000) 25-0512
Setbacks Front 30'
Setback Side 1 10'
Setbacks Rear 25'
Dev Permit # F023-
Setback Side 2 10'
Are you applying for a 5 year temporary permit? No
Serial # 64991735
Wind Zone? 3
Residential or Commercial Use? Residential
Service Amps 200
How many of bedrooms does this home have? 3
How many bathrooms does this home have? 2
Review Notes
6/25/2025 Application pending.
7/5/2025 Point Review - Pre-submittal Review Notes
7/7/2025 Point Review - Pre-submittal Review Notes
8/4/2025 Point Review - Pre-submittal Review Notes
8/5/2025 Point Review - Pre-submittal Review Notes
8/13/2025 Point Review - Pre-submittal Review Notes
8/21/2025 Point Review - Pre-submittal Review Notes
8/26/2025 Point Review - Pre-submittal Review Notes
8/28/2025 Point Review - Ready for applicant submittal
9/1/2025 Point Review - Ready for applicant submittal
9/2/2025 Application submitted by applicant.
9/2/2025 Point Review - Reviewed
9/2/2025 Zoning Review - Reviewed
9/2/2025 Plan Review - Reviewed
9/2/2025 Final Review - Reviewed
9/2/2025 Final Review - Payment Needed
9/2/2025 Permit Issued
9/2/2025 Final Review - Complete
Contractors
Name/ Business License Title Role
Jacob Trowell
Trowell's Mobile Home Set Up Llc
IH1148380 Mh Installer (ih) Contractor
Inspections
Inspection Notes Performed By Date
Passed: Mobile Home - In County Pre-Mobile Home before set-up Anthony Aslan 7/22/2025
Septic Release Inspection Health Dept 7/30/2025
Passed: Mobile Home - Mobile Home Set-Up Final Matt Forsyth 10/1/2025
Release to power company Matt Forsyth 10/1/2025
Passed: Engineering - Setbacks No Other Dwelling On Property Matt Forsyth 10/1/2025