Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Storage Building Permit

Address 562 NW BISON CT
WHITE SPRINGS, FL 32096
Parcel #: 01593-112
Acres: 4.73
Owner: Campbell Melinda Kay,
Subdivision: Nature Conservancy Unr
Zoning: A-3
Flood Zone: X
District: 1
Application #: 72645
Permit #: 000053925
Related Permit:
Submitted: Monday, August 11, 2025
Issued: Wednesday, August 27, 2025
Expires: Saturday, May 2, 2026
Completed:
Status: Permit Issued
Septic Release? Yes
Notes:
*NON-HABITABLE STRUCTURE *NEW SLAB, NO MP, ELECTRICAL TO BE INCLUDED
Job Details
Finished floor requirement
Fema map number 12023C0390C
What is the power service for? Storage Building
Other job details: Existing approval from environmental health approved. Check October 3rd 2024 for existing release.
Power Company Clay Electric
Septic # (00-0000) or (X00-000) 24-0719
Electrical Code Edition 2020 National Electrical Code
Meter or Account: Meter
Meter or Account #: 156 214 991
Number of requested AMPS for electrical service: 200
Is the power service? New Power Service
Residential or Commercial? Residential
Review Notes
8/11/2025 Application pending.
8/13/2025 Point Review - Ready for applicant submittal
8/13/2025 Application submitted by applicant.
8/14/2025 Plan Review - Building Approved
8/14/2025 Plan Review - Reviewed
8/14/2025 Zoning Review - Processing
8/14/2025 Final Review - Processing
8/26/2025 Zoning Review - Corrections Needed
8/27/2025 Permit Issued
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Septic Release Inspection Health Dept 9/9/2025
Passed: Building - Footer Christian Allen 11/3/2025
Passed: Electrical - 1st Underground Rough–In Christian Allen 11/3/2025
Passed: Building - Slab Christian Allen 11/3/2025
Documents
File Name Date File Size