Permit Details

Permit Search

Permit

New Residential Construction

420 SW SABRE AVE
LAKE CITY, FL 32024

Permit #
000053903
Application #
71732
Status Completed
  1. Submitted Jul 6, 2025
  2. Issued Aug 26, 2025
  3. Expires Nov 24, 2026
  4. Completed May 29, 2026

Property

Parcel #
00366-002
Owner
Albritton Lawrence W,
Acres
20.14
Subdivision
—
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0270C
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2398
Total Area (Sqft)
3368
Building Height
21
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
SINGLE FAMILY DWELLING
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
25-0354
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Point Review - Pre-submittal Review Notes
  3. Point Review - Pre-submittal Review Notes
  4. Point Review - Pre-submittal Review Notes
  5. Point Review - Pre-submittal Review Notes
  6. Point Review - Pre-submittal Review Notes
  7. Point Review - Ready for applicant submittal
  8. Application submitted by applicant.
  9. Point Review - Reviewed
  10. Zoning Review - Reviewed
  11. Plan Review - Plumbing Approved
  12. Plan Review - Mechanical Approved
  13. Plan Review - Electrical Approved
  14. Plan Review - Building Approved
  15. Plan Review - Reviewed
  16. Final Review - Processing
  17. Final Review - Reviewed
  18. Final Review - Payment Needed
  19. Final Review - Payment Needed
  20. Permit Issued
  21. Final Review - Complete
  22. Blower Door Test Results was not accepted.
  23. Termite Treatment - Final was not accepted.
  24. Blower Door Test Results was not accepted.

Contractors

  • Sara E Gresham

    John Norris Construction, Llc

    License
    CRC1331978
    Title
    Cert. Residential
    Role
    Contractor
  • Donald R Hollingsworth

    Holly Electric Inc

    License
    EC13005429
    Title
    Electrical
    Role
    Subcontractor
  • Jan R Touchton

    Touchton's Heating & Air Conditioning Inc

    License
    CAC058747
    Title
    Cert. A/c Class “a”
    Role
    Subcontractor
  • Don C Bills Sr

    Hometown Plumbing Services Llc

    License
    CFC1428890
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Mary C Johnson

    Rcra Johnson Roofing,inc.

    License
    CCC1330073
    Title
    Roofing Contractor
    Role
    Subcontractor

Inspections

  1. Aug 28, 2025

    Passed: Building - Footer

    Inspected by Troy Crews

  2. Aug 28, 2025

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  3. Oct 2, 2025

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  4. Oct 8, 2025

    Passed: Building - Slab

    Inspected by Matt Forsyth

  5. Oct 13, 2025

    Passed: Electrical - Temporary Power Service

    Inspected by Matt Forsyth

  6. Oct 14, 2025

    Release to power company

    Inspected by Tcrews

  7. Oct 14, 2025

    Submitted Power Release through FPL Portal

    Inspected by Ward, Emaleigh C.

  8. Oct 28, 2025

    Release to power company

    Cahnge From Fpl To Sve

    Inspected by Ewilliams

  9. Nov 6, 2025

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  10. Nov 6, 2025

    Passed: Building - Wall Sheathing

    Inspected by Matt Forsyth

  11. Nov 25, 2025

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Matt Forsyth

  12. Nov 25, 2025

    Passed: Building - Framing

    Need To Inspect Windows And Doors Before Insulation

    Inspected by Matt Forsyth

  13. Nov 25, 2025

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  14. Nov 25, 2025

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Inspected by Matt Forsyth

  15. Nov 25, 2025

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  16. Nov 25, 2025

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  17. Jan 27, 2026

    Passed: Building - Insulation

    Inspected by Matt Forsyth

  18. Apr 22, 2026

    Passed: Electrical - Permanent Power

    *septic Rec'd, Drive Final Required- Culvert Was Never Finalized By Public Works-- Must Be Done Prior To Release Of Power-- 4.29.26 Mg

    Inspected by Matt Forsyth

  19. Apr 28, 2026

    Septic Release Inspection

    Inspected by Health Dept

  20. May 1, 2026

    Release to power company

    Rec'd Septic And Final Drive

    Inspected by Ewilliams

  21. May 28, 2026

    Passed: Building - Final

    *all Requirements Met To Release Co-- 5.29.26 Mg

    Inspected by Matt Forsyth

Documents