Permit Details

Permit Search

Permit

New Residential Construction

1218 SW MANDIBA DR
LAKE CITY, FL 32024

Permit #
000053886
Application #
71900
Status Completed
  1. Submitted Jul 3, 2025
  2. Issued Aug 21, 2025
  3. Expires Aug 11, 2026
  4. Completed Feb 12, 2026

Property

Parcel #
09280-161
Owner
Shelley Daniel P, Shelley Rachel D
Acres
1.99
Subdivision
Oaks Of Lake City Phase 2
Zoning
PRRD
Flood zone
X
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Subdivision Plat
Finished floor requirement
77'
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0395C
This is the construction of a
Other
If Other, explain the use of the structure.
pool house
Heated Area (Sqft)
798
Total Area (Sqft)
1007
Stories
1
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Septic# (00-0000) or (X00-000)
25-0536
Service Amps
200
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.

Status & Review History

  1. Application pending.
  2. Point Review - Pre-submittal Review Notes
  3. Point Review - Pre-submittal Review Notes
  4. Point Review - Pre-submittal Review Notes
  5. Point Review - Pre-submittal Review Notes
  6. Point Review - Pre-submittal Review Notes
  7. Point Review - Pre-submittal Review Notes
  8. Application Converted
  9. Point Review - Pre-submittal Review Notes
  10. Point Review - Ready for applicant submittal
  11. Application submitted by applicant.
  12. Application submitted by applicant.
  13. Point Review - Reviewed
  14. Zoning Review - Reviewed
  15. Plan Review - Plumbing Approved
  16. Plan Review - Mechanical Approved
  17. Plan Review - Electrical Approved
  18. Plan Review - Building Approved
  19. Plan Review - Reviewed
  20. Final Review - Reviewed
  21. Final Review - Payment Needed
  22. Permit Issued

Contractors

  • Bryan Zecher

    Bryan Zecher Homes Inc

    License
    CBC1257343
    Title
    Building Contractor
    Role
    Contractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Robert Ogles

    Ogles Roofing & Construction Llc

    License
    CCC1328699
    Title
    Cert Roofing
    Role
    Subcontractor

    County License & State License Expired.

  • Donald R Hollingsworth

    Holly Electric Inc

    License
    EC13005429
    Title
    Electrical
    Role
    Subcontractor
  • Anthony R Franks

    Lane Heating & Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Sep 3, 2025

    Passed: Building - Footer

    Rebar Chairs Need To Be Stood Up

    Inspected by Anthony Aslan

  2. Sep 26, 2025

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Gary Pitzer

  3. Oct 9, 2025

    Passed: Building - Slab

    Plastic And Tape, Rebar Wired

    Inspected by Gary Pitzer

  4. Oct 28, 2025

    Passed: Building - Roof Decking

    Inspected by Gary Pitzer

  5. Oct 28, 2025

    Passed: Building - Wall Sheathing

    Inspected by Gary Pitzer

  6. Nov 6, 2025

    Passed: Building - Framing

    Inspected by Gary Pitzer

  7. Nov 6, 2025

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Gary Pitzer

  8. Nov 6, 2025

    Passed: Electrical - 2nd Rough-In

    Inspected by Gary Pitzer

  9. Nov 12, 2025

    Passed: Building - Insulation

    Foam Walls And Roof

    Inspected by Gary Pitzer

  10. Nov 13, 2025

    Passed: Building - Lath/Stucco

    Inspected by Gary Pitzer

  11. Jan 26, 2026

    Septic Release Inspection

    Inspected by Health Dept

  12. Feb 4, 2026

    Passed: Building - Final

    Knee Blower Door For Final Release

    Inspected by Troy Crews

  13. Feb 12, 2026

    Passed: Certificate - Release Certificate

    Blower Door Recieved

    Inspected by Crews, Malcolm T.

Documents