Permit Details

Permit Search

Permit

Roof Replacement or Repair

442 NW FAIRWAY DR
LAKE CITY, FL 32055

Permit #
000053850
Application #
72575
Status Completed
  1. Submitted Aug 5, 2025
  2. Issued Aug 15, 2025
  3. Expires Mar 11, 2026
  4. Completed Sep 12, 2025

Property

Parcel #
02309-028
Owner
Patel Nilesh & Rupal, Patel Rupal
Acres
0.76
Subdivision
Fairway View Unit 1
Zoning
RSF-2
Flood zone
A
District
3

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0280D
Type Roofing Job
Replacement - Tear off Existing and Replace
Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
remove existing tile and replace existing tile per troy, the noa for this product is acceptable due to being rated for miami-dade
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
4500
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
Yes
Type of New Roofing Product
Concrete
Florida Product Approval Number
7849
Product Manufacturer
westlake
Product Description
flat tile
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.)
a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.
Ventilation:
Unvented
Flashing:
Use Existing
Drip Edge:
Replace All
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. City of Lake City Utilities Notified.
  4. Final Review - Corrections Needed
  5. Final Review - Payment Needed
  6. Permit Issued
  7. Final Review - Complete

Contractors

  • Christopher O'brien

    O'brien Contracting

    License
    CCC1335947
    Title
    Cert. Roofing
    Role
    Contractor

    County License & State License & Liability Insurance & Workers Comp Expired.

Inspections

  1. Aug 18, 2025

    Passed: Re-Roof - Roof Affidavit Review

    Inspected by Troy Crews

  2. Sep 8, 2025

    Passed: Re-Roof - In Progress

    Inspected by Troy Crews

  3. Sep 11, 2025

    Passed: Re-Roof - Roof Pictures Review

    Inspected by Troy Crews

  4. Sep 12, 2025

    Passed: Re-Roof - Final

    Inspected by Troy Crews