Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Mobile Home Permit

Address 743 SW ALLISON TER
LAKE CITY, FL 32024
Parcel #: 00439-307
Acres: 10.00
Owner: Crews Kevin Lee, Mathews Amy Michelle
Subdivision: Allison Crossing Unr (division Of Land)
Zoning: A-3
Flood Zone: X
District: 2
Application #: 72468
Permit #: 000053833
Related Permit: Right-of-Way Access/Driveway: 000052636
Submitted: Wednesday, July 30, 2025
Issued: Friday, September 12, 2025
Expires: Thursday, September 18, 2025
Completed: Thursday, September 18, 2025
Status: Completed
Septic Release? Yes
Notes:
*MFE = BOTTOM OF THE LOWEST BEAM MUST BE 1' ABOVE THE ROAD *SEPTIC & DRIVE FINAL REQUIRED PRIOR TO RELEASE OF POWER AND CO
Job Details
Elevation regulation Minimum Requirement
Finished floor requirement Bottom of lowest beam must be one foot above the road
Fema map number 12023C0360C
Mobile Home is a: Double Wide
Year Built 2026
Width (Ft.In) 28
Length (Ft.In) 60
Driveway access to home: Private Driveway Permit
Installation Decal # 122040
Septic # (00-0000) or (X00-000) 25-0582
Setbacks Front 30'
Setback Side 1 25'
Setbacks Rear 25'
Setback Side 2 25'
Are you applying for a 5 year temporary permit? No
Serial # CAV340FL25-24249AB
Wind Zone? 2
Residential or Commercial Use? Residential
Service Amps 200
How many of bedrooms does this home have? 3
How many bathrooms does this home have? 2
Review Notes
7/30/2025 Application pending.
7/31/2025 Point Review - Pre-submittal Review Notes
8/4/2025 Point Review - Pre-submittal Review Notes
8/13/2025 Point Review - Ready for applicant submittal
8/13/2025 Application submitted by applicant.
8/13/2025 Point Review - Reviewed
8/13/2025 Zoning Review - Reviewed
8/13/2025 Plan Review - Reviewed
8/13/2025 Final Review - Reviewed
8/13/2025 Final Review - Payment Needed
8/13/2025 Application submitted by applicant.
8/13/2025 Permit Issued
8/14/2025 Final Review - Complete
8/14/2025 Final Review - Complete
9/12/2025 Permit Reissued
9/12/2025 Permit Reissued
9/12/2025 Permit Reissued
Contractors
Name/ Business License Title Role
Kyle Johnson
Florida Mfg Foundations Llc
IH1126657 Mh (dih) Dealer/installer Contractor
Timothy D Shatto
Shatto Heating & Air, Inc.
CAC057875 A/c Class B Subcontractor
Donald Davis
High Springs Electric Inc
EC0002306 Electrical Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Mobile Home - Mobile Home Set-Up Final All Requirements Met To Release Power And Co-- 9.18.25 Mg Matt Forsyth 9/15/2025
Passed: Engineering - Setbacks Matt Forsyth 9/15/2025
Release to power company Septic Release Rec'd 9.18.25 Mg Mgarber 9/18/2025
Septic Release Inspection Health Dept 9/18/2025