| Finished floor requirement |
|
| Fema map number |
12023C0293D |
| Type Roofing Job |
Re-Cover - New Material over Existing |
| Further Job Details (Explain if decking is being replaced and or Repairs are being done.) |
Install EPS flute fill. Install EPS fanfold, mechanically attached. Install Duro-Tuff 50 mil pvc system, mechanically attached. Install Duro-Last approved flashings for all penetrations. |
| Type of structure |
Commercial Building |
| Commercial or Residential |
Commercial |
| Roof Area (for this job) Sq Ft |
442 |
| No. of Stories |
1 |
| Roof Pitch |
Less than 2:12 |
| Is the existing roof being removed? |
No |
| Explain if not removing the existing roofing material? |
this is a Retro fit roof. The Duro Tuff 50 mil pvc roof system will go over the top of the existing roof. |
| Type of New Roofing Product |
Flat or Membrane type |
| Florida Product Approval Number |
FL1559-R19 |
| Product Manufacturer |
Duro-Last |
| Product Description |
Duro Tuff PVC system |
| Building Code Edition |
2023 Florida Building Code 8th Edition and 2020 National Electrical Code |
| Sealed roof decking options: (Must select an option.) |
Other (explain) |
| Sealed roof decking explanation for other option. |
No underlayment. This is a Retro fit roof using a Duro Tuff 50 mil pvc roofing system |
| Ventilation: |
Off-ridge Vent |
| Flashing: |
Use Existing |
| Drip Edge: |
Replace All |
| Valley Treatment: |
Use Existing |
| Any cable and/or race-way wiring located on or within the roof assembly? |
No |