Permit Details

Permit Search

Permit

Mobile Home

314 SW BEN OAKS GLN
LAKE CITY, FL 32024

Permit #
000053828
Application #
72316
Status Completed
  1. Submitted Jul 25, 2025
  2. Issued Aug 13, 2025
  3. Expires Apr 22, 2026
  4. Completed Oct 30, 2025

Property

Parcel #
03742-002
Owner
Holderfield Pamela Hosli
Acres
5.00
Subdivision
—
Zoning
ESA-2
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
Bottom of lowest beam must be one foot above the road
Fema map number
12023C0370C
Mobile Home is a:
Double Wide
Year Built
2026
Width (Ft.In)
32
Length (Ft.In)
64
Driveway access to home:
Private Driveway Permit
Installation Decal #
116757
Septic #
25-0606
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
LOHGA20039751AB
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200
How many of bedrooms does this home have?
5
How many bathrooms does this home have?
3

Status & Review History

  1. Application pending.
  2. Point Review - Pre-submittal Review Notes
  3. Point Review - Ready for applicant submittal
  4. Application submitted by applicant.
  5. Application submitted by applicant.
  6. Point Review - Reviewed
  7. Zoning Review - Reviewed
  8. Plan Review - Reviewed
  9. Final Review - Documents Required
  10. Final Review - Reviewed
  11. Final Review - Payment Needed
  12. Permit Issued
  13. Final Review - Complete

Contractors

  • Brent M Strickland

    License
    IH1104218
    Title
    Mh Installer (ih)
    Role
    Contractor
  • William Pringle

    Action Signs & Graphics Inc

    License
    EC13015190
    Title
    Cert. Electrical
    Role
    Subcontractor
  • Michael A Boland

    Ace A/c Of Ocala Llc

    License
    CAC1817716
    Title
    Cert Class B A/c
    Role
    Subcontractor

Inspections

  1. Oct 24, 2025

    Passed: Mobile Home - Mobile Home Set-Up Final

    Final Septic Release Required Prior To Release Of Power And Co--10.25.25 Mg

    Inspected by Christian Allen

  2. Oct 24, 2025

    Passed: Engineering - Setbacks

    Inspected by Christian Allen

  3. Oct 30, 2025

    Release to power company

    Inspected by Ewilliams

  4. Oct 30, 2025

    Septic Release Inspection

    Inspected by Health Dept