Permit Details

Permit Search

Permit

Mobile Home

947 SE OCTOBER RD
LAKE CITY, FL 32025

Permit #
000053817
Application #
72121
Status Completed
  1. Submitted Jul 17, 2025
  2. Issued Aug 11, 2025
  3. Expires May 4, 2026
  4. Completed Nov 12, 2025

Property

Parcel #
09553-029
Owner
Corrao Michael, Corrao John
Acres
6.24
Subdivision
Rolling Hills Unr
Zoning
RR
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
Bottom of lowest beam must be one foot above the road
Fema map number
12023C0505C
Mobile Home is a:
Double Wide
Year Built
2026
Width (Ft.In)
28
Length (Ft.In)
56
Driveway access to home:
Private Driveway Permit
Septic #
25-0582
Setbacks Front
25'
Setback Side 1
10'
Setbacks Rear
15'
Setback Side 2
10'
Are you applying for a 5 year temporary permit?
No
Serial #
FL261-000-H-B205276AB
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200
How many of bedrooms does this home have?
3
How many bathrooms does this home have?
2

Status & Review History

  1. Application pending.
  2. Point Review - Pre-submittal Review Notes
  3. Point Review - Pre-submittal Review Notes
  4. Point Review - Pre-submittal Review Notes
  5. Point Review - Pre-submittal Review Notes
  6. Point Review - Ready for applicant submittal
  7. Application submitted by applicant.
  8. Point Review - Reviewed
  9. Zoning Review - Reviewed
  10. Plan Review - Reviewed
  11. Final Review - Reviewed
  12. Final Review - Payment Needed
  13. Permit Issued
  14. Final Review - Complete

Contractors

  • Robert D Sheppard

    Robert Sheppard Mobile Home Set Up Llc

    License
    IH1025386
    Title
    Mh Installer (ih)
    Role
    Contractor

    County License & Liability Insurance Expired.

Inspections

  1. Sep 18, 2025

    Septic Release Inspection

    Inspected by Health Dept

  2. Nov 5, 2025

    Passed: Mobile Home - Mobile Home Set-Up Final

    All Requirements Met To Release Co-- 11.12.25 Mg

    Inspected by Christian Allen

  3. Nov 5, 2025

    Release to power company

    Inspected by Christian Allen

  4. Nov 5, 2025

    Passed: Engineering - Setbacks

    Inspected by Christian Allen