| Septic Release Inspection |
|
Health Dept |
8/12/2025 |
| Passed: Swimming Pool - Pool Deck/Piping Pressure |
|
Anthony Aslan |
8/26/2025 |
| Cancelled: Engineering - Driveway Spot Check |
|
Anthony Aslan |
8/26/2025 |
| Cancelled: Engineering - Setbacks |
|
Anthony Aslan |
8/26/2025 |
| Passed: Swimming Pool - Pool Steel and Ground |
|
Anthony Aslan |
9/3/2025 |
| Passed: Swimming Pool - Pool Footer |
|
Anthony Aslan |
9/3/2025 |
| Passed: Electrical - Pool/Deck Bonding |
No Handrail Cups Installed |
Anthony Aslan |
9/3/2025 |
| Failed: Swimming Pool - Pool Safety and Final |
Heater Over Fused |
Gary Pitzer |
11/17/2025 |
| Passed: Swimming Pool - Pool Safety and Final |
Breaker Changed, Photo On File |
Gary Pitzer |
11/24/2025 |