| Inspection |
Notes |
Performed By |
Date |
| Failed: Building - Footer |
Washed In Need To Dry Out And Clean Out |
Troy Crews |
8/15/2025 |
| Passed: Engineering - Setbacks |
|
Troy Crews |
8/15/2025 |
| Passed: Building - Footer |
|
Troy Crews |
8/18/2025 |
| Passed: Engineering - Setbacks |
|
Troy Crews |
8/18/2025 |
| Passed: Building - Lintel/Tie Beam |
Block Walls In Bathroom Shelter |
Troy Crews |
8/22/2025 |
| Rescheduled 9/25/2025:Fire - Fire Final |
|
Tcrews |
9/23/2025 |
| Rescheduled 9/25/2025:Building - Final |
|
Tcrews |
9/23/2025 |
| Failed: Fire - Fire Final |
Needs An Exit Light Above Doorway In The Bar And Exit Light On Door Behind The Bar |
Sahne Overstreet |
9/25/2025 |
| Failed: Building - Final |
Need To Complete Power Connections To Pre-fab Bathrooms, Complete Overhead Lighting Over Sink Areas. Complete Gravel At Sidewalk Area Between Building To Prevent Trip Hazard. Fire Dept Needs Exit Light At North Door Of Bar Area |
Troy Crews |
9/25/2025 |
| Rescheduled 9/30/2025:Building - Final |
|
Aaslan |
9/29/2025 |
| Failed: Building - Final |
Need To Complete Steps To Stage, If Top Riser Not Level With Stage Will Need Handrail For Four Or More Risers., S.e.buillding Not Built Out Will Require Review And Permitting At Later Date. |
Troy Crews |
9/30/2025 |
| Release to power company |
Rec'd Septic And Pics For Steps
|
Ewilliams |
10/10/2025 |
| Passed: Certificate-Release Certificate |
Rec'd Septic/pics Of Stage Steps |
Crews, Malcolm T. |
10/10/2025 |
| Septic Release Inspection |
|
Health Dept |
10/10/2025 |
| Passed: Building - Final |
Handrails Installed |
Troy Crews |
10/10/2025 |
| Passed: Electrical - Permanent Power |
|
Troy Crews |
10/10/2025 |
| Release to power company |
|
Troy Crews |
10/10/2025 |
| (Requested) Engineering-D.O.T Final Driveway |
|
|
|
| (Requested) Building-Final |
|
|
|