Permit Details

Permit Search

Permit

Right-of-Way Access/Driveway

101 SW GREEN ACRES WAY
LAKE CITY, FL 32024

Permit #
000053759
Application #
72260
Status Completed
  1. Submitted Jul 23, 2025
  2. Issued Aug 2, 2025
  3. Expires Aug 18, 2029
  4. Completed Aug 19, 2026

Property

Parcel #
02434-205
Owner
Spicer Paul, Spicer Geralyn
Acres
2.53
Subdivision
Cypress Lake Phase 3
Zoning
RSF-2
Flood zone
X
District
3

Permit

Status
Completed
Septic release
N/A
Related permit
New Residential Construction: 000053872

Job Details

Finished floor requirement
Fema map number
12023C0290D
Building Permit #
000053872
Standards
Culvert installation shall conform to the approved site plan standards
Requirements
An 18” storm pipe of approved material is required with a minimum length of 32 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long
Status
Permanent
Type of connection for access road
Curb & Gutter
Type of construction of property
Site Built Home
Normal vehicle usage:
Automobiles
Side Drain required
Yes
Side Drain Size (diameter in inches)
18
Study Required
No
Estimated Number of Vehicle trips per day
4
Is the access for commercial or residential use?
Residential
County Road Type
Paved
Side Drain Length (minimum feet)
32

Status & Review History

  1. Pending applicant completion and submission.
  2. Final Review - Processing
  3. Final Review - Processing
  4. Application submitted by applicant.
  5. Pending Public Works Application Approval
  6. Application submitted by applicant.
  7. Pending Public Works Application Approval
  8. Application submitted by applicant.
  9. Pending Public Works Application Approval
  10. Final Review - Processing
  11. Application Approved by Public Works
  12. Final Review - Payment Needed
  13. Pending initial driveway inspection
  14. Final Review - Complete
  15. Permit Issued

Contractors

No contractors are listed on this permit.

Inspections

  1. Jul 29, 2025

    Passed: Engineering - ROW Access/Driveway connects to county maintained road

    Inspected by Chad Williams

  2. Aug 1, 2025

    Passed: Engineering - Initial Driveway

    Inspected by Beach, Garrett

  3. Aug 5, 2026

    Passed: Engineering - Driveway Spot Check

    inspection Notes: Home Under Construction

    Inspected by Smith, Blake

  4. Aug 19, 2026

    Passed: Engineering - Final Driveway

    Inspected by Beach, Garrett