Right-of-Way Access/Driveway
Permit
| Address |
, |
| Parcel #: |
07486-001 |
| Acres: | 47.98 |
| Owner: | Suwannee River Water Management District, |
| Subdivision: | |
| Zoning: | RR |
| Flood Zone: | X |
| District: | 4 |
| Application #: | 72093 |
| Permit #: |
000053742 |
| Related Permit: |
|
| Submitted: | Tuesday, July 15, 2025 |
| Issued: | Thursday, July 31, 2025 |
| Expires: | Thursday, August 28, 2025 |
| Completed: | Thursday, August 28, 2025 |
| Status: |
Completed |
| Septic Release? |
N/A |
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0311D |
| Standards |
Culvert installation shall conform to the approved site plan standards |
| Requirements |
An 18” storm pipe of approved material is required with a minimum length of 32 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long |
| Status |
Permanent |
| Type of connection for access road |
Rural Driveway |
| Type of construction of property |
None |
| If the type of construction is not listed, please describe below |
vacant land |
| Normal vehicle usage: |
Automobiles;Trucks;Farm Equipment |
| Side Drain required |
Yes |
| Side Drain Size |
18 |
| Study Required |
No |
| Estimated Number of Vehicle trips per day |
1 |
| Is the access for commercial or residential use? |
Commercial |
| County Road Type |
Paved |
Review Notes
| 7/15/2025 |
Application submitted by applicant. |
| 7/15/2025 |
Pending Public Works Application Approval |
| 7/21/2025 |
Application Approved by Public Works |
| 7/23/2025 |
Final Review - Payment Needed |
| 7/28/2025 |
Pending initial driveway inspection |
| 7/31/2025 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Engineering - ROW Access/Driveway connects to county maintained road |
|
Chad Williams |
7/15/2025 |
| Passed: Engineering - Initial Driveway |
|
Beach, Garrett |
7/29/2025 |
| Passed: Engineering - Final Driveway |
|
Beach, Garrett |
8/28/2025 |