Permit Details

Permit Search

Permit

Roof Replacement or Repair

376 SW CALLAWAY DR
LAKE CITY, FL 32024

Permit #
000053721
Application #
72362
Status Completed
  1. Submitted Jul 28, 2025
  2. Issued Jul 31, 2025
  3. Expires Mar 10, 2026
  4. Completed Sep 11, 2025

Property

Parcel #
03023-248
Owner
Stephens Robert Ray And Catherine Ann Joint Declaration Of Trust,
Acres
0.48
Subdivision
Callaway Phase 2
Zoning
RSF-2
Flood zone
X
District
3

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0289D
Type Roofing Job
Replacement - Tear off Existing and Replace
Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
shingles
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
3012
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
Yes
Type of New Roofing Product
Asphalt Shingles
Florida Product Approval Number
FL10124.1
Product Manufacturer
GAF Timberline
Product Description
Asphalt Shingles
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.)
a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.
Ventilation:
Off-ridge Vent
Flashing:
Replace All
Drip Edge:
Replace All
Valley Treatment:
New Mineral Surface
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. City of Lake City Utilities Notified.
  3. Final Review - Documents Required
  4. Application submitted by applicant.
  5. City of Lake City Utilities Notified.
  6. Final Review - Payment Needed
  7. Permit Issued
  8. Final Review - Complete

Contractors

  • Harry D Anderson Jr

    Southeastern Coatings & Waterproofing, Inc.

    License
    CCC1326114
    Title
    Roofing Contractor
    Role
    Contractor

Inspections

  1. Aug 19, 2025

    Passed: Re-Roof - In Progress

    Inspected by Matt Forsyth

  2. Sep 9, 2025

    Rescheduled 9/10/2025:Re-Roof - Roof Affidavit Review

    Inspected by Mgarber

  3. Sep 9, 2025

    Rescheduled 9/10/2025:Re-Roof - Roof Pictures Review

    Inspected by Mgarber

  4. Sep 10, 2025

    Passed: Re-Roof - Roof Affidavit Review

    Inspected by Matt Forsyth

  5. Sep 10, 2025

    Passed: Re-Roof - Roof Pictures Review

    Inspected by Matt Forsyth

  6. Sep 11, 2025

    Passed: Re-Roof - Final

    Inspected by Matt Forsyth