Permit Details

Permit Search

Permit

Mobile Home

656 SW BARNEY ST
HIGH SPRINGS, FL 32643

Permit #
000053648
Application #
72090
Status Completed
  1. Submitted Jul 18, 2025
  2. Issued Jul 23, 2025
  3. Expires Mar 8, 2026
  4. Completed Sep 18, 2025

Property

Parcel #
09961-013
Owner
Connelly Sara Elizabeth,
Acres
2.30
Subdivision
—
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
Bottom of lowest beam must be one foot above the road
Fema map number
12023C0513C
Mobile Home is a:
Triple Wide
Year Built
2016
Width (Ft.In)
30
Length (Ft.In)
76
Driveway access to home:
Existing Drive
Installation Decal #
120307
Septic #
25-0548
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
LOHGA11617166ABC
Wind Zone?
2
Residential or Commercial Use?
Residential
How many of bedrooms does this home have?
4
How many bathrooms does this home have?
3

Status & Review History

  1. Point Review - Pre-submittal Review Notes
  2. Point Review - Pre-submittal Review Notes
  3. Point Review - Pre-submittal Review Notes
  4. Point Review - Pre-submittal Review Notes
  5. Point Review - Ready for applicant submittal
  6. Application submitted by applicant.
  7. Point Review - Received-Hard Copy Application
  8. Point Review - Reviewed
  9. Zoning Review - Reviewed
  10. Plan Review - Reviewed
  11. Final Review - Reviewed
  12. Final Review - Payment Needed
  13. Permit Issued
  14. Final Review - Complete

Contractors

  • Jacob Trowell

    Trowell's Mobile Home Set Up Llc

    License
    IH1148380
    Title
    Mh Installer (ih)
    Role
    Contractor

Inspections

  1. Jul 18, 2025

    Passed: Mobile Home - In County Pre-Mobile Home before set-up

    Inspected by Anthony Aslan

  2. Sep 9, 2025

    Passed: Mobile Home - Mobile Home Set-Up Final

    All Requirements Met To Release Power And Co-- 9.18.25 Mg

    Inspected by Anthony Aslan

  3. Sep 9, 2025

    Passed: Engineering - Setbacks

    Appears Within Setbacks

    Inspected by Anthony Aslan

  4. Sep 18, 2025

    Release to power company

    Septic Release Rec'd 9.18.25

    Inspected by Mgarber

  5. Sep 18, 2025

    Septic Release Inspection

    Inspected by Health Dept