5/13/2025
|
Point Review - Reviewed
**OWNER DOES NOT HAVE AN EMAIL**
NEEDED
* SUB FORM NEEDS TO BE SIGNED
* # OF BEDROOMS/BATHROOMS
* ENVIRONMENTAL HEALTH SIGNED SITE PLAN - CONTACT 386-758-1058
* CORRECTED SITE PLAN - NEED DISTANCES FROM ALL 4 PROPERTY LINES TO PROPOSED HOME
* PROOF OF WINDZONE
|
5/15/2025
|
Zoning Review - Corrections Needed
**OWNER DOES NOT HAVE AN EMAIL**
NEEDED
* SUB FORM NEEDS TO BE SIGNED
* # OF BEDROOMS/BATHROOMS
* CORRECTED SITE PLAN - NEED DISTANCES FROM ALL 4 PROPERTY LINES TO PROPOSED HOME
* PROOF OF WINDZONE
ZONING: FLOODPLAIN DEVELOPMENT PERMIT HAS BEEN CREATED SINCE DEVELOPMENT IS LOCATED WITHIN THE SFHA. EC REQUIRED PRIOR TO ISSUANCE OF PERMIT.
**SITE PLAN IS INSUFFICENT. WE NEED TO KNOW THE DISTANCE TO EACH PARCEL LINE. SIDE YARD SETBACK OF 10 FT IS ALLOWED IN THREE RIVERS SD. RESUBMIT SITE PLAN.
|
5/16/2025
|
Zoning Review - Corrections Needed
**OWNER DOES NOT HAVE AN EMAIL**
* PROOF OF WINDZONE
ZONING: FLOODPLAIN DEVELOPMENT PERMIT HAS BEEN CREATED SINCE DEVELOPMENT IS LOCATED WITHIN THE SFHA.
****EC REQUIRED PRIOR TO ISSUANCE OF PERMIT.
*FINAL CONSTRUCTION ELEVATION CERTIFICATE IS REQUIRED PRIOR TO FINAL INSPECTION
|
5/27/2025
|
Zoning Review - Corrections Needed
**OWNER DOES NOT HAVE AN EMAIL**
needed:
***is this replacing the existing site built home? yes selected, but still shown on site plan and listed on eh paperwork
*drive approval-- see app #71241
ZONING: FLOODPLAIN DEVELOPMENT PERMIT HAS BEEN CREATED SINCE DEVELOPMENT IS LOCATED WITHIN THE SFHA.
****EC REQUIRED PRIOR TO ISSUANCE OF PERMIT.
*FINAL CONSTRUCTION ELEVATION CERTIFICATE IS REQUIRED PRIOR TO FINAL INSPECTION
|
5/27/2025
|
Plan Review - Reviewed
**OWNER DOES NOT HAVE AN EMAIL**
NEEDED:
***IS THIS REPLACING THE EXISTING SITE BUILT HOME? YES SELECTED, BUT STILL SHOWN ON SITE PLAN AND LISTED ON EH PAPERWORK
*DRIVE APPROVAL-- SEE APP #71241
ZONING: FLOODPLAIN DEVELOPMENT PERMIT HAS BEEN CREATED SINCE DEVELOPMENT IS LOCATED WITHIN THE SFHA.
****EC REQUIRED PRIOR TO ISSUANCE OF PERMIT.
*FINAL CONSTRUCTION ELEVATION CERTIFICATE IS REQUIRED PRIOR TO FINAL INSPECTION
|
5/27/2025
|
Zoning Review - Corrections Needed
**OWNER DOES NOT HAVE AN EMAIL**
NEEDED:
***IS THIS REPLACING THE EXISTING SITE BUILT HOME? YES SELECTED, BUT STILL SHOWN ON SITE PLAN AND LISTED ON EH PAPERWORK
*DRIVE APPROVAL-- SEE APP #71241
ZONING: FLOODPLAIN DEVELOPMENT PERMIT HAS BEEN CREATED SINCE DEVELOPMENT IS LOCATED WITHIN THE SFHA.
****EC REQUIRED PRIOR TO ISSUANCE OF PERMIT.
*FINAL CONSTRUCTION ELEVATION CERTIFICATE IS REQUIRED PRIOR TO FINAL INSPECTION
|
5/29/2025
|
Zoning Review - Corrections Needed
**OWNER DOES NOT HAVE AN EMAIL**
NEEDED:
***IS THIS REPLACING THE EXISTING SITE BUILT HOME? YES SELECTED, BUT STILL SHOWN ON SITE PLAN AND LISTED ON EH PAPERWORK
*DRIVE APPROVAL-- SEE APP #71241
ZONING: FLOODPLAIN DEVELOPMENT PERMIT HAS BEEN CREATED SINCE DEVELOPMENT IS LOCATED WITHIN THE SFHA.
****EC REQUIRED PRIOR TO ISSUANCE OF PERMIT.
*FINAL CONSTRUCTION ELEVATION CERTIFICATE IS REQUIRED PRIOR TO FINAL INSPECTION
** 1’ Rise report from Engineer per LDR 8.5.3.2
|
6/10/2025
|
Zoning Review - Corrections Needed
**OWNER DOES NOT HAVE AN EMAIL**
NEEDED:
***IS THIS REPLACING THE EXISTING SITE BUILT HOME? YES SELECTED, BUT STILL SHOWN ON SITE PLAN AND LISTED ON EH PAPERWORK
*DRIVE APPROVAL-- SEE APP #71241
ZONING: FLOODPLAIN DEVELOPMENT PERMIT HAS BEEN CREATED SINCE DEVELOPMENT IS LOCATED WITHIN THE SFHA.
****EC REQUIRED PRIOR TO ISSUANCE OF PERMIT.
*FINAL CONSTRUCTION ELEVATION CERTIFICATE IS REQUIRED PRIOR TO FINAL INSPECTION
** 1’ RISE REPORT FROM ENGINEER PER LDR 8.5.3.2
|
6/16/2025
|
Zoning Review - Corrections Needed
**OWNER DOES NOT HAVE AN EMAIL**
NEEDED:
***IS THIS REPLACING THE EXISTING SITE BUILT HOME? YES SELECTED, BUT STILL SHOWN ON SITE PLAN AND LISTED ON EH PAPERWORK
*DRIVE APPROVAL-- SEE APP #71241
ZONING: FLOODPLAIN DEVELOPMENT PERMIT HAS BEEN CREATED SINCE DEVELOPMENT IS LOCATED WITHIN THE SFHA.
****EC REQUIRED PRIOR TO ISSUANCE OF PERMIT.
*FINAL CONSTRUCTION ELEVATION CERTIFICATE IS REQUIRED PRIOR TO FINAL INSPECTION
** 1’ RISE REPORT FROM ENGINEER PER LDR 8.5.3.2
|
6/21/2025
|
Zoning Review - Corrections Needed
**OWNER DOES NOT HAVE AN EMAIL**
NEEDED:
***IS THIS REPLACING THE EXISTING SITE BUILT HOME? YES SELECTED, BUT STILL SHOWN ON SITE PLAN AND LISTED ON EH PAPERWORK
*DRIVE APPROVAL-- SEE APP #71241
ZONING: FLOODPLAIN DEVELOPMENT PERMIT HAS BEEN CREATED SINCE DEVELOPMENT IS LOCATED WITHIN THE SFHA.
****EC REQUIRED PRIOR TO ISSUANCE OF PERMIT.
*FINAL CONSTRUCTION ELEVATION CERTIFICATE IS REQUIRED PRIOR TO FINAL INSPECTION
** 1’ RISE REPORT FROM ENGINEER PER LDR 8.5.3.2
|
6/27/2025
|
Zoning Review - Corrections Needed
**OWNER DOES NOT HAVE AN EMAIL**
NEEDED:
***IS THIS REPLACING THE EXISTING SITE BUILT HOME? YES SELECTED, BUT STILL SHOWN ON SITE PLAN AND LISTED ON EH PAPERWORK
*DRIVE APPROVAL-- SEE APP #71241
ZONING: FLOODPLAIN DEVELOPMENT PERMIT HAS BEEN CREATED SINCE DEVELOPMENT IS LOCATED WITHIN THE SFHA.
****EC REQUIRED PRIOR TO ISSUANCE OF PERMIT.
*FINAL CONSTRUCTION ELEVATION CERTIFICATE IS REQUIRED PRIOR TO FINAL INSPECTION
** 1’ RISE REPORT FROM ENGINEER PER LDR 8.5.3.2
|
7/3/2025
|
Zoning Review - Documents Required
**OWNER DOES NOT HAVE AN EMAIL**
NEEDED:
***IS THIS REPLACING THE EXISTING SITE BUILT HOME? YES SELECTED, BUT STILL SHOWN ON SITE PLAN AND LISTED ON EH PAPERWORK. HOUSE IS ALREADY DEMOLISHED.
*DRIVE APPROVAL-- SEE APP #71241
ZONING:
** 1’ RISE REPORT FROM ENGINEER PER LDR 8.5.3.2
|
7/18/2025
|
Zoning Review - Documents Required
**OWNER DOES NOT HAVE AN EMAIL**
***HOME HAS ALREADY BEEN DEMOLISHED***
ZONING:
** 1’ RISE REPORT FROM ENGINEER PER LDR 8.5.3.2
|
7/21/2025
|
Zoning Review - Reviewed
**OWNER DOES NOT HAVE AN EMAIL**
***HOME HAS ALREADY BEEN DEMOLISHED***
ZONING:
** 1’ RISE REPORT FROM ENGINEER PER LDR 8.5.3.2 - rec'd
|
7/21/2025
|
Permit Issued
Permit #000053629 created and approved.
|