Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Storage Building Permit

Address 213 SW WASHINGTON AVE
FORT WHITE, FL 32038
Parcel #: 01037-001
Acres: 0.96
Owner: Bedenbaugh Alvin, Bedenbaugh Teri
Subdivision: Three Rivers Estates Unit 18
Zoning: A-3
Flood Zone: X
District: 2
Application #: 71631
Permit #: 000053601
Related Permit: Site Use Approval: SITE-USE2025-117
Submitted: Friday, June 20, 2025
Issued: Wednesday, July 16, 2025
Expires: Friday, August 15, 2025
Completed: Friday, August 15, 2025
Status: Completed
Septic Release? Yes
Notes:
*NON-HABITABLE STRUCTURE *NO SLAB, NO MP, ELECTRICAL TO BE INCLUDED
Job Details
Elevation regulation Accessory Use
Finished floor requirement Non-Habitable Structure
Fema map number 12023C0458C
Type of Structure Storage Building
Commercial or Residential? Residential
Total Area (Sqft) 2016
Septic# (00-0000) or (X00-000) 25-0517
Setbacks Front 30'
Setback Side 1 10'
Setback Side 2 10'
Setback Rear 10' (accessory)
Building Code Construction Type III
Building Code Element B
Building Code Occupancy Types Storage
Occupancy Use Title *NON-HABITABLE STRUCTURE
Dev Permit # F023-
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Building Height 16'
Length 48'
Width 42'
Service Amps 200
Slab None
Mechanical No
Electrical Yes
Plumbing No
Review Notes
6/20/2025 Application pending.
6/25/2025 Point Review - Pre-submittal Review Notes
6/27/2025 Point Review - Pre-submittal Review Notes
7/5/2025 Point Review - Pre-submittal Review Notes
7/7/2025 Point Review - Pre-submittal Review Notes
7/10/2025 Point Review - Pre-submittal Review Notes
7/14/2025 Point Review - Ready for applicant submittal
7/14/2025 Application submitted by applicant.
7/14/2025 Point Review - Printed-Online Application
7/14/2025 Point Review - Reviewed
7/14/2025 Zoning Review - Reviewed
7/16/2025 Plan Review - Documents Required
7/16/2025 Plan Review - Reviewed
7/16/2025 Final Review - Reviewed
7/16/2025 Final Review - Payment Needed
7/16/2025 Permit Issued
7/16/2025 Failed to auto issue permit on credit card payment.
7/17/2025 Final Review - Complete
Contractors
Name/ Business License Title Role
Donald Davis
High Springs Electric Inc
EC0002306 Electrical Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Septic Release Inspection Health Dept 7/2/2025
Passed: Building - Footer Matt Forsyth 7/22/2025
Passed: Engineering - Setbacks Matt Forsyth 7/22/2025
Passed: Electrical - Permanent Power Cannot Release Power Until Driveway Permit Has Final Inspection. Matt Forsyth 8/14/2025
Release to power company Driveway Was Verification Of Existing Ewilliams 8/15/2025
Passed: Building - Final No Dwelling On Property Matt Forsyth 8/15/2025