Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Mobile Home Permit

Address 191 NW BONITA WAY
LAKE CITY, FL 32055
Parcel #: 01719-003
Acres: 0.29
Owner: Norris Jonathan,
Subdivision: Suwannee Valley Estates
Zoning: A-3
Flood Zone: X
District: 1
Application #: 71093
Permit #: 000053546
Related Permit: Site Use Approval: SITE-USE2025-121
Submitted: Wednesday, June 18, 2025
Issued: Tuesday, July 8, 2025
Expires: Sunday, January 4, 2026
Completed:
Status: Final Review - Complete
Septic Release? Yes
Notes:
*MFE = 90.65' PER FLOOD STUDY, ELEVATION CONFIRMATION REQUIRED *STRING 30' FRONT SETBACK, IF IT CAN'T BE VERIFIED, SURVEYOR MUST CONFIRM *SEPTIC RELEASE AND DRIVE FINAL REQUIRED PRIOR TO RELEASE OF POWER AND CO
Job Details
Finished floor requirement
Fema map number 12023C0415C
What is the power service for? Existing Mobile Home
Other job details: Generator installation
Power Company Clay Electric
Septic # (00-0000) or (X00-000) x22
Electrical Code Edition 2017 National Electrical Code
Meter or Account: Meter
Meter or Account #: 156 218 764
Number of requested AMPS for electrical service: 200
Is the power service? Generator Install
Residential or Commercial? Residential
Review Notes
5/20/2025 Application pending.
6/18/2025 Point Review - Pre-submittal Review Notes
6/20/2025 Point Review - Pre-submittal Review Notes
6/24/2025 Point Review - Pre-submittal Review Notes
6/26/2025 Point Review - Pre-submittal Review Notes
7/5/2025 Point Review - Pre-submittal Review Notes
7/7/2025 Point Review - Ready for applicant submittal
7/7/2025 Point Review - Ready for applicant submittal
7/7/2025 Point Review - Ready for applicant submittal
7/8/2025 Point Review - Ready for applicant submittal
7/8/2025 Application submitted by applicant.
7/8/2025 Point Review - Printed-Online Application
7/8/2025 Point Review - Reviewed
7/8/2025 Zoning Review - Reviewed
7/8/2025 Plan Review - Reviewed
7/8/2025 Final Review - Processing
7/8/2025 Final Review - Processing
7/8/2025 Final Review - Reviewed
7/8/2025 Final Review - Payment Needed
7/8/2025 Permit Issued
7/8/2025 Failed to auto issue permit on credit card payment.
7/9/2025 Final Review - Complete
Contractors
Name/ Business License Title Role
Jacob Trowell
Trowell's Mobile Home Set Up Llc
IH1148380 Mh Installer (ih) Contractor
Donald Hollingsworth Ii
Holly Electric Inc
EC13012104 Cert. Electrical Subcontractor
David E Hall
David Hall's Air Cond & Heating Svc,inc.
CAC057424 Class B A/c Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Mobile Home - In County Pre-Mobile Home before set-up Roof Ceiling Repairs And Window Repairs Must Be Completed Prior To Power Troy Crews 6/23/2025
Septic Release Inspection Health Dept 10/30/2025
Documents
File Name Date File Size