| Inspection |
Notes |
Performed By |
Date |
| Passed: Electrical - Temporary Power Service |
|
Christian Allen |
10/3/2025 |
| Release to power company |
Temp Power |
Ewilliams |
10/8/2025 |
| Release to power company |
|
Mgarber |
10/8/2025 |
| Passed: Electrical - 1st Underground Rough–In |
|
Matt Forsyth |
10/8/2025 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
Water Supply Under Slab Under Pressure |
Matt Forsyth |
10/8/2025 |
| Passed: Building - Monolithic Slab |
Bait System Must Be Used If Not Doing An Initial Termite Treatment |
Matt Forsyth |
10/10/2025 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
10/10/2025 |
| Release to power company |
|
Pweaver |
10/14/2025 |
| Passed: Building - Roof Decking |
|
Matt Forsyth |
10/20/2025 |
| Passed: Building - Strapping |
|
Matt Forsyth |
10/20/2025 |
| Passed: Building - Wall Sheathing |
|
Matt Forsyth |
10/20/2025 |
| Passed: Building - Framing |
|
Matt Forsyth |
10/27/2025 |
| Passed: Mechanical - Rough In |
|
Matt Forsyth |
10/27/2025 |
| Passed: Plumbing/Gas - Tub Set/Shower Pan |
Tub Tested For Leaks |
Matt Forsyth |
10/27/2025 |
| Passed: Plumbing/Gas - 2nd Rough-In |
Water Supply Under Pressure |
Matt Forsyth |
10/27/2025 |
| Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
10/27/2025 |
| Passed: Building - Insulation |
|
Matt Forsyth |
10/29/2025 |
| Septic Release Inspection |
|
Health Dept |
11/6/2025 |
| Passed: Electrical - Permanent Power |
Need Elevation Confirmation Letter Prior To Power Release |
Troy Crews |
11/25/2025 |
| Release to power company |
Rec'd Surveyor Letter Approved By Kas |
Ewilliams |
12/3/2025 |
| Passed: Building - Final |
All Requirements Met To Release Co-- 12.16.25 Mg |
Matt Forsyth |
12/11/2025 |