Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Additions Permit

Address 588 SW MEADOW TER
LAKE CITY, FL 32024
Parcel #: 03405-113
Acres: 1.27
Owner: Shaheen David, Shaheen Christy
Subdivision: Southwood Meadows
Zoning: A-3
Flood Zone: X
District: 5
Application #: 71565
Permit #: 000053537
Related Permit: Site Use Approval: SITE-USE2025-099
Submitted: Wednesday, June 18, 2025
Issued: Tuesday, July 8, 2025
Expires: Tuesday, April 14, 2026
Completed:
Status: Permit Issued
Septic Release? Yes
Notes:
*FINAL SEPTIC REQUIRED PRIOR TO RELEASE OF POWER
Job Details
Finished floor requirement
Fema map number 12023C0381D
Type Roofing Job Replacement - Tear off Existing and Replace
Further Job Details (Explain if decking is being replaced and or Repairs are being done.) Remove existing roof. replace with new shingle roof. Repair decking as needed per FBC
Type of structure Mobile Home
Commercial or Residential Residential
Roof Area (for this job) Sq Ft 20
No. of Stories 1
Roof Pitch 2:12 to 4:12
Is the existing roof being removed? Yes
Type of New Roofing Product Asphalt Shingles
Florida Product Approval Number FL10124.2
Product Manufacturer GAF
Product Description asphalt shingle
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Ventilation: Ridge Vent
Flashing: Replace All
Drip Edge: Replace All
Valley Treatment: New Mineral Surface
Any cable and/or race-way wiring located on or within the roof assembly? No
Review Notes
6/16/2025 Application pending.
6/18/2025 Point Review - Pre-submittal Review Notes
6/21/2025 Point Review - Pre-submittal Review Notes
6/24/2025 Point Review - Pre-submittal Review Notes
6/26/2025 Point Review - Ready for applicant submittal
6/27/2025 Point Review - Ready for applicant submittal
6/29/2025 Point Review - Ready for applicant submittal
6/30/2025 Application submitted by applicant.
6/30/2025 Point Review - Received-Hard Copy Application
6/30/2025 Point Review - Reviewed
6/30/2025 Zoning Review - Reviewed
7/1/2025 Plan Review - Documents Required
7/7/2025 Plan Review - Plumbing Approved
7/7/2025 Plan Review - Mechanical Approved
7/7/2025 Plan Review - Electrical Approved
7/7/2025 Plan Review - Building Approved
7/7/2025 Plan Review - Reviewed
7/7/2025 Final Review - Processing
7/7/2025 Final Review - Reviewed
7/7/2025 Final Review - Payment Needed
7/8/2025 Final Review - Complete
7/8/2025 Permit Issued
Contractors
Name/ Business License Title Role
Roger Leavitt
Roger Leavitt Electric
EC13006243 Cert. Electrical Subcontractor
Jeremiah J Cook
Cook's Heat & Air Conditioning Inc
CAC1813212 Class B A/c Contractor Subcontractor
Kenneth R Roche
Ken Roche Plumbing Inc Dba Plumbing Now
CFC1426527 Plumbing Contractor Subcontractor
Ralph W Laverdure
Rwl Roofing Llc
CCC1328590 Roofing Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Septic Release Inspection Health Dept 6/26/2025
Passed: Building - Footer Clean Out Cave In Spots Prior To Pour Troy Crews 8/8/2025
Passed: Engineering - Setbacks Troy Crews 8/8/2025
Passed: Plumbing/Gas - 1st Underground Rough–In Troy Crews 8/21/2025
Passed: Building - Slab Troy Crews 8/25/2025
Passed: Building - Ext Strapping/Wall Sheathing Matt Forsyth 9/10/2025
Passed: Building - Roof Decking Gary Pitzer 9/11/2025
Passed: Building - Wall Sheathing Gary Pitzer 9/11/2025
Passed: Building - Framing Gary Pitzer 9/22/2025
Passed: Building - Strapping Gary Pitzer 9/22/2025
Passed: Building - Window Attachment Gary Pitzer 9/22/2025
Passed: Electrical - 1st Underground Rough–In Gary Pitzer 9/22/2025
Passed: Electrical - 2nd Rough-In Exterior Walls Only Gary Pitzer 9/22/2025
Cancelled: Electrical - Above Ceiling Gpitzer 9/22/2025
Passed: Building - Insulation Foam Walls And Attic Gary Pitzer 10/1/2025
Passed: Plumbing/Gas - 2nd Rough-In Gary Pitzer 10/1/2025
Passed: Mechanical - Rough In Gary Pitzer 10/16/2025
Documents
File Name Date File Size