Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 242 NW AMBLESIDE DR
LAKE CITY, FL 32055
Parcel #: 02275-129
Acres: 2.00
Owner: Moss David M, Moss Tiffany C
Subdivision: Cobblestone Unit 2
Zoning: RR
Flood Zone: X
District: 1
Application #: 71008
Permit #: 000053449
Related Permit: Site Use Approval: SITE-USE2025-084
Submitted: Wednesday, May 14, 2025
Issued: Tuesday, June 24, 2025
Expires: Tuesday, April 28, 2026
Completed:
Status: Permit Status Update Notification
Septic Release? No
Notes:
*MFE = 162' PER SUBDIVISION PLAT, SURVEYOR CONFIRMATION REQUIRED AT NAILING *SEPTIC FINAL AND DRIVE FINAL REQUIRED PRIOR TO RELEASE OF POWER *ASSESSMENTS OWED @ PERM POWER, BLOWER DOOR AND FINAL TERMITE REQUIRED PRIOR TO CO
Job Details
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0382D
In floodway N
Building Permit # 000040447
Standards Shall conform to Public Works Determinations as stated below
Requirements Install min, 32 ' × 18 " corr metal culvert w / concrete mitred ends, w / 6 " × 6 " welded wire, rebar or culvert bolts in mitred ends, concrete mitred ends W - 4ft x L - 5ft, and with 4 inches of limerock on top cover.
Status Approved
Review Notes
5/14/2025 Point Review - Printed-Online Application
5/19/2025 Zoning Review - Processing
5/19/2025 Plan Review - Documents Required
5/19/2025 Zoning Review - Reviewed
5/19/2025 Plan Review - Plumbing Approved
5/19/2025 Plan Review - Mechanical Approved
5/19/2025 Plan Review - Electrical Approved
5/19/2025 Plan Review - Building Approved
5/19/2025 Plan Review - Reviewed
5/19/2025 Final Review - Documents Required
5/27/2025 Final Review - Documents Required
5/29/2025 Final Review - Documents Required
6/3/2025 Final Review - Documents Required
6/3/2025 Final Review - Documents Required
6/6/2025 Final Review - Documents Required
6/10/2025 Final Review - Documents Required
6/15/2025 Final Review - Documents Required
6/17/2025 Final Review - Documents Required
6/20/2025 Final Review - Processing
6/21/2025 Final Review - Reviewed
6/21/2025 Final Review - Payment Needed
6/24/2025 Final Review - Complete
6/24/2025 Permit Issued
11/4/2025 Final Review - Payment Needed
11/21/2025 Permit Status Update Notification
Contractors
Name/ Business License Title Role
Mark Bauer
Gibraltar Contracting Llc
Employees Workers Comp Expired.
CBC1259633 Cert Building Contractor
Matthew H Burns
Burns Electrical Services Inc
EC13006531 Electrical Contractor Subcontractor
Clinton G Wilson
Wilson Heat & Air Inc
CAC057886 Class B A/c Subcontractor
James Butler Jr
Butler Plumbing Of Gainesville Inc
Workers Comp Expired.
CFC057960 Plumbing Contractor Subcontractor
Lewis G Walker
Lewis Walker Roofing Inc
CCC1333551 Cert. Roofing Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Setbacks Appears To Meet Setbacks With Markers That Are On Site Gary Pitzer 7/8/2025
Passed: Building - Footer Clearing Of Roots Inprogress Gary Pitzer 7/8/2025
Passed: Plumbing/Gas - 1st Underground Rough–In Waste Lines Only Troy Crews 7/25/2025
Passed: Plumbing/Gas - 1st Underground Rough–In Water Lines One Hundred Psi Troy Crews 7/28/2025
Passed: Building - Slab Contractor Uses Bait System For Termite Control Troy Crews 8/1/2025
Passed: Building - Roof Decking Troy Crews 9/5/2025
Passed: Building - Wall Sheathing Troy Crews 9/5/2025
Passed: Building - Framing Christian Allen 10/13/2025
Passed: Plumbing/Gas - 2nd Rough-In Christian Allen 10/13/2025
Passed: Electrical - 2nd Rough-In Christian Allen 10/13/2025
Passed: Mechanical - Rough In Christian Allen 10/13/2025
Passed: Building - Insulation Christian Allen 10/27/2025
Failed: Electrical - Permanent Power Need Surveyor Confirmation Letter Of 162' Or Greater Per Plat Troy Crews 10/30/2025
Passed: Electrical - Temporary Power Service Temp Pole, Need Elevation Confirmation Letter Prior To Any Further Inspections Troy Crews 10/30/2025
Release to power company Temp Service Passed Ewilliams 11/25/2025
Submitted Power Release through FPL Portal Garber, Melissa 11/25/2025
Documents
File Name Date File Size