Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Roof Replacement or Repair Permit

Address 254 SW MATTIE CT
LAKE CITY, FL 32025
Parcel #: 09124-107
Acres: 4.94
Owner: Edenfield Matthew, Edenfield Jessica
Subdivision: Crawford Pointe
Zoning: A-3
Flood Zone: X
District: 4
Application #: 71680
Permit #: 000053434
Related Permit:
Submitted: Monday, June 23, 2025
Issued: Monday, June 23, 2025
Expires: Monday, January 12, 2026
Completed:
Status: Permit Issued
Septic Release? na
Notes:

Job Details
Finished floor requirement
Fema map number 12023C0384D
Type Roofing Job Overlay with Metal
Type of structure Mobile Home
Commercial or Residential Residential
Roof Area (for this job) Sq Ft 1560
No. of Stories 1
Roof Pitch 2:12 to 4:12
Is the existing roof being removed? No
Type of New Roofing Product Metal
Florida Product Approval Number 17992
Product Manufacturer capital
Product Description 26 gauge
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.) Other (explain)
Sealed roof decking explanation for other option. overlay with metal
Ventilation: Ridge Vent
Flashing: Use Existing
Drip Edge: Use Existing
Valley Treatment: New Metal
Any cable and/or race-way wiring located on or within the roof assembly? No
Review Notes
6/23/2025 Permit Issued Permit #000053434 created and approved.
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Passed: Re-Roof - In Progress Roof Complete Anthony Aslan 7/16/2025