Right-of-Way Access/Driveway
Permit
| Application #: | 71443 |
| Permit #: |
000053374 |
| Related Permit: |
|
| Submitted: | Thursday, June 5, 2025 |
| Issued: | Friday, June 13, 2025 |
| Expires: | Friday, June 20, 2025 |
| Completed: | Friday, June 20, 2025 |
| Status: |
Completed |
| Septic Release? |
N/A |
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0390C |
| Standards |
Culvert installation shall conform to the approved site plan standards |
| Requirements |
An 18” storm pipe of approved material is required with a minimum length of 32 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long |
| Status |
Permanent |
| Type of connection for access road |
Rural Driveway;Drainage |
| Type of construction of property |
Site Built Home |
| If the type of construction will contain units or lots, please enter the number of units or lots below |
2 |
| Normal vehicle usage: |
Automobiles;Trucks |
| Side Drain required |
Yes |
| Side Drain Size |
18 |
| Study Required |
No |
| Estimated Number of Vehicle trips per day |
2 |
| Is the access for commercial or residential use? |
Residential |
| County Road Type |
Paved |
Review Notes
| 6/5/2025 |
Application pending. |
| 6/5/2025 |
Application submitted by applicant. |
| 6/5/2025 |
Pending Public Works Application Approval |
| 6/10/2025 |
Application Approved by Public Works |
| 6/12/2025 |
Final Review - Payment Needed |
| 6/12/2025 |
Pending initial driveway inspection |
| 6/12/2025 |
Final Review - Complete |
| 6/12/2025 |
Final Review - Status Cleared |
| 6/13/2025 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Rescheduled 6/10/2025:Engineering - ROW Access/Driveway connects to county maintained road |
|
Emaleigh Williams |
6/9/2025 |
| Passed: Engineering - ROW Access/Driveway connects to county maintained road |
|
Chad Williams |
6/10/2025 |
| Passed: Engineering - Verify existing driveway |
|
Smith, Blake |
6/12/2025 |
| Passed: Engineering - Initial Driveway |
|
Smith, Blake |
6/12/2025 |
| Passed: Engineering - Final Driveway |
|
Smith, Blake |
6/20/2025 |